• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Sunday, October 18, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Business

CEC Kargil inspects 1.5 MW Sangrah Mini HP

K H News Service by K H News Service
December 7, 2018
in Business
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Kargil: Chairman and Chief Executive Councilor, LAHDC, Kargil Feroz Ahmed Khan Friday visited 1.5 MW Sangrah Mini Hydel Project and inspected the current status of power generation at the project.
The CEC was accompanied by Councillor Thasgam Abdul Rahim, Councillor Tai Suru Aga Syed Abbass Razvi, Project Director Kargil Renewable Energy Development Agency (KREDA) Kacho Ahmad Khan, Executive Engineer M&RE PDD Altaf Ahmad besides other concerned officers.
The CEC went round different sections of the project and inquired from the engineers about the power supply being provided to the locals these days.
The engineers informed the CEC that a limited power is being generated at the project in the winter time due to low discharge of water in the canal.
The locals, while expressing serious concern over the unsatisfactory power supply from the project, cited technical faults and said power is not being generated despite the availability of sufficient water in the project canal. They urged the CEC to intervene into the matter and direct the authorities of KREDA to rectify the technical faults so as to ensure smooth supply of power.
Responding to concern of the people, the CEC directed the Project Director KREDA to personally look into the matter and constitute committees comprising engineers as well as the village representatives to ascertain the actual cause of low power generation. He fixed one week’s deadline for the committee to come up with its findings and assured the locals that requisite follow up steps will be taken as per the committees report.
Meanwhile, the locals projected a number of demands including the construction of check dams and crates along the sides of the project canal, modification in the power transmission line from Mini Hydel Project Sangrah to Sangrah Thang, up gradation of the Hydel Project approach road, provision of new DG sets at Chullungs, Banyalsa and Youkma villages, repair of transformers at Goma and Lunkha besides other demands.
The CEC gave a patient hearing to all demands and concerns of the people and assured them that all genuine demands will be fulfilled in a phased manner.

K H News Service

K H News Service

Related Posts

Javid Dar attends review meeting on nationwide ‘Khet Bachao Abhiyan’

Javid Dar attends review meeting on nationwide ‘Khet Bachao Abhiyan’
by KH Business Desk
October 18, 2026

Srinagar : Minister for Agriculture Production, Rural Development and Panchayati Raj, Cooperative and Election Departments, Javid Ahmad Dar, today participated...

Read moreDetails

CEO SSCL inspects Smart City Infra

CEO SSCL inspects Smart City Infra
by KH Business Desk
October 18, 2026

Dr Basharat directs enhanced operational efficiency, Infra upkeep and sustainable Urban Mobility   Srinagar| Oct,17:Chief Executive Officer, Srinagar Smart City...

Read moreDetails

Northern Railway revises timings of several trains in Jammu Division from Oct 18

Railway Board Sanctions Trial Halt of Vande Bharat Express at Anantnag
by KH Business Desk
October 18, 2026

Changes follow extension of Sabarmati–Jammu Tawi Express to Katra; passengers advised to check schedules   Jammu :Northern Railway has revised...

Read moreDetails

Dir Agri Kashmir inaugurates sale of Onion Seedlings at Gangbugh for farming Community

Dir Agri Kashmir inaugurates sale of Onion Seedlings at Gangbugh for farming Community
by KH Business Desk
October 18, 2026

Srinagar : Director Agriculture Kashmir, Sartaj Ahmad Shah, Saturday  inaugurated the sale of onion seedlings for the farming community at...

Read moreDetails

KVK Bandipora-1 organises Technology Demo on Brown Sarson at Kootasatrie NICRA Village

KVK Bandipora-1 organises Technology Demo on Brown Sarson at Kootasatrie NICRA Village
by KH Business Desk
October 18, 2026

Bandipora :: Krishi Vigyan Kendra (KVK) Bandipora-1, Sher-e-Kashmir University of Agricultural Sciences and Technology of Kashmir (SKUAST-Kashmir), organised a Technology...

Read moreDetails

DC Pulwama reviews power sector; takes stock of progress under RDSS

DC Pulwama reviews power sector; takes stock of progress under RDSS
by KH Business Desk
October 17, 2026

Sidha directs winter preparedness, 100% revenue realization and time-bound completion of RDSS and metering works   Pulwama : Deputy Commissioner...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW