• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Monday, July 13, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

Another milestone in the USBRL Project!, Track laying work begins on Chenab Bridge

Agencies by Agencies
February 22, 2023
in Top News
A A
Arch of world’s highest railway bridge on Chenab river completed
Share on FacebookShare on TwitterWhatsappTelegramEmail

Jammu : The track laying work commenced on the Chenab railway bridge, located 359 metres above the riverbed, in Reasi district of Jammu and Kashmir commenced, officials said Tuesday.
The 1.3-kilometre-long bridge, which is 35 metres higher than the iconic Eiffel Tower in Paris, forms a crucial link in the 111-km stretch from Katra to Banihal, which is part of the Rs 21,653 crore Udhampur-Srinagar-Baramulla Railway Link (USBRL) project.
“Another milestone in USBRL Project! Track laying work begins on Chenab Bridge. Once completed, this bridge will open up new possibilities for the remote regions of Jammu and Kashmir,” the Ministry of Railways tweeted.
The base of the steel and concrete arch bridge between Bakkal and Kauri, 42 kilometres from Reasi town, was completed in November 2017, allowing for the start of the construction of the main arch which was done in April 2021.
Another milestone on the bridge was achieved in August last year when the overarch deck of the bridge was completed with a Golden Joint’, paving way for the laying of the track.
As per the officials, the construction work on the bridge started in 2004 but had to be suspended in 2008-09 to consider the aspect of safety of rail passengers in view of frequent high velocity winds in the area.
Once completed, the bridge will be able to withstand winds with speed up to 260 kmph and will have a lifespan of 120 years, the officials said.
Besides the highest railway bridge, the USBRL project has many firsts like the longest railway tunnel having overall length of 12.75 km, first cable-stayed bridge which when completed will be an engineering marvel of the 21st century.
Out of the total 272-km USBRL project, the 161-km was commissioned in phases, with the first phase 118-km Qazigund-Baramulla section commissioned in October 2009 followed by 18-km Banihal-Qazigund in June 2013 and 25-km Udhampur-Katra in July 2014.
The work on the project, which is the most challenging railway infrastructure project being undertaken post-independence, was started in 1997 and has missed several deadlines amid huge cost escalations.
The under-construction 111-km Katra-Banihal section has a total of 37 bridges (26 major and 11 minor), 35 tunnels with a length of 164 kms (main 27 with 97.64 km and eight escape tunnels with 66.40 km)

Agencies

Agencies

Related Posts

‘Enough is enough’, says Omar at Jammu’s ‘Delhi Chalo’ rally to press for statehood

CM Omar Abdullah terms Punjab livestock vehicle levy ‘unjust’, seeks Mann’s intervention
by United News of India
July 13, 2026

Jammu, Jul 12 (UNI) Declaring that “enough is enough,” Jammu and Kashmir Chief Minister Omar Abdullah Sunday announced a ‘Delhi...

Read moreDetails

Youth are the builders of our future: LG Sinha

LG Sinha Steers Secure Amarnath Yatra Preparations
by K H News Service
July 13, 2026

Attends Lal Ded Literary Award Function and Launches Book on Lal Ded Do not settle for ordinary achievements. Dream big,...

Read moreDetails

CM desperately trying to rebrand himself as anti-BJP warrior: LoP Sharma

Assembly doesn’t have powers to challenge Art 370 removal: LoP in LA
by K H News Service
July 13, 2026

“Omar Abdullah will be remembered as J&K’s most incompetent CM; people know he wasted two years between marathon tracks and...

Read moreDetails

Dr. Farooq, Omar pay glowing tributes to 13th July 1931 Martyrs 

Dr Farooq, CM Omar greet people on 77th Republic Day
by K H News Service
July 13, 2026

Say NC remains true custodian of legacy of July 13 martyrs, committed to carrying forward their mission of building a...

Read moreDetails

Altaf Bukhari pays tributes to the martyrs of July 13

Altaf Bukhari urges Centre to initiate dialogue, confidence-building measures in J&K
by K H News Service
July 13, 2026

Says, the historic day reminds us of the courage and sacrifices of those who stood up for justice, dignity, and...

Read moreDetails

DC Anantnag visits cloudburst hit areas, takes stock of damage, restoration efforts

DC Anantnag reviews availability of Fuel, LPG in district
by K H News Service
July 13, 2026

Directs early resumption of essential services, assures all possible assistance to affected families ANANTNAG, JULY 12: In order to take...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire