• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Friday, October 23, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Business

CEO, JKERA inspects progress on construction of new Infertility,Oncology Block at Lal Ded Hospital

KH Correspondent by KH Correspondent
February 3, 2026
in Business
A A
CEO, JKERA inspects progress on construction of new Infertility,Oncology Block at Lal Ded Hospital
Share on FacebookShare on TwitterWhatsappTelegramEmail

Singhal directs expeditious execution, parallel works and strict monitoring to meet timelines

Srinagar : Chief Executive Officer, J&K Economic Reconstruction Agency (ERA) /JTFRP, Shreya Singhal, Monday inspected the progress of work on the construction of the state-of-the-art 108-bed additional block for specialised Infertility and Gynae Oncology at Lal Ded Hospital, Srinagar.
The project is being executed under the World Bank funded Jhelum Tawi Flood Recovery Project (JTFRP) implemented by PWD (R&B), which is being constructed at an estimated cost of Rs 118 crore using seismic-resistant base isolation technology.
During the inspection, the concerned officers briefed the Chief Executive Officer about the salient features of the project, highlighting that the building is being constructed as per modern hospital architectural standards being adopted nationally and internationally. The G+5 structure with attic and stilt parking will house specialised zones including modular operation theatres, ICUs, High Dependency Units (HDUs), LDR suites, pre- and post-natal care wards, recovery wards and dedicated patient waiting lounges, with a total built-up area of 11,640 square metres.
The CEO was informed that foundation works of the building have been completed and that the project is entering a crucial phase, with planning and design nearing completion and prefabricated structural components being manufactured off-site and expected to reach the project location shortly.
Emphasising the importance of timely completion of this critical healthcare infrastructure, the CEO directed that the project be expedited and completed well before 31st August, with multiple activities taken up in parallel to avoid any time overruns. She instructed the Project Implementation Unit (R&B) and Project Management Support (PMS) teams to conduct weekly site visits to closely monitor progress and ensure adherence to timelines.
The CEO further stressed the need for streamlined coordination with key stakeholder departments, particularly the Health Department, to ensure seamless execution of works and timely integration of services.
Additionally, the CEO instructed the PIU to expedite procurement of medical, electrical and mechanical equipment, so that installation can proceed in sync with civil works as part of the integrated health sector project.
Senior officers including the Chief Engineer, PWD (R&B) (Central) Superintending Engineer, PWD (R&B) Central, Project Manager J&KERA Kashmir, Executive Engineer PWD (R&B) Central, Deputy Project Manager J&KERA Kashmir and other officials from PWD (R&B) and J&KERA accompanied the CEO during the site inspection.

KH Correspondent

KH Correspondent

Related Posts

Div Com (K) reviews progress of Sewerage Scheme, sets One-Month deadline

Div Com (K) reviews progress of Sewerage Scheme, sets One-Month deadline
by KH Business Desk
October 23, 2026

Srinagar : Divisional Commissioner Kashmir,  Anshul Garg on Thursday reviewed the progress of the Comprehensive Sewerage Scheme of Greater Srinagar,...

Read moreDetails

J&K bank hosting awareness camp on Social Security Schemes, Re-KYC, Digital Frauds at Jammu on Oct 23

J&K bank hosting awareness camp on Social Security Schemes, Re-KYC, Digital Frauds at Jammu on Oct 23
by KH Business Desk
October 23, 2026

Jammu : A Mega Camp on Social Security Schemes, Re-KYC, inoperative JDY accounts and digital frauds will be organised tomorrow...

Read moreDetails

Agriculture Department Kashmir launches Khet Bachao Abhiyan campaign

Agriculture Department Kashmir launches Khet Bachao Abhiyan campaign
by KH Business Desk
October 23, 2026

Srinagar : Agriculture Production and Farmers Welfare Department Kashmir Thursday  launched Khet Bachao Abhiyan and the campaign will run from...

Read moreDetails

SKUAST-Kashmir kicks off two-day training programme on ‘Revival and Promotion of Millets’ at KVK Gurez

SKUAST-Kashmir kicks off two-day training programme on ‘Revival and Promotion of Millets’ at KVK Gurez
by KH Business Desk
October 23, 2026

Bandipora | Oct, 10:The Faculty of Agriculture (FoA), Wadura, Sher-e-Kashmir University of Agricultural Sciences and Technology of Kashmir (SKUAST-Kashmir), in...

Read moreDetails

DC Budgam chairs DLIC Meeting, Reviews HADP, JKCIP implementation

DC Budgam chairs DLIC Meeting, Reviews HADP, JKCIP implementation
by KH Business Desk
October 23, 2026

Kishore directs increased farmer enrolment, timely case processing, loan sanctions & achievement of scheme targets   Budgam| Oct, 22: Deputy...

Read moreDetails

Farmer mobilisation drive in Pampore promotes pulse cultivation, collectivisation

Farmer mobilisation drive in Pampore promotes pulse cultivation, collectivisation
by KH Business Desk
October 23, 2026

Pampore, October 22: A farmer mobilisation drive was organised at Meej, Pampore, by The Kashmir Almond FPO Cooperative Limited under...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire