• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Saturday, November 7, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

Udhampur-Bla Rail project: Country’s first cable-stayed rail bridge in Reasi completed

Agencies by Agencies
April 30, 2023
in Top News
A A
Arch of world’s highest railway bridge on Chenab river completed
Share on FacebookShare on TwitterWhatsappTelegramEmail

Jammu, New Delhi: The work on the country’s first cable-stayed railway bridge at Anji Khad in Reasi district of Jammu and Kashmir has been completed, Railway Minister Ashwini Vaishnaw said.
The completion of the bridge drew praise from Prime Minister Narendra Modi who is keenly monitoring the Udhampur-Srinagar-Baramulla Railway Link (USBRL), which will provide rail connectivity between the Kashmir Valley and the rest of the country.
“In 11 months, India’s first cable-stayed rail bridge (Anji Khad) is ready…,” Railway Minister Ashwini Vaishnaw tweeted on Friday, sharing a video of the completed bridge. The total length of the cable strand used in the bridge is 653 km.
Reacting to Vaishnaw’s tweet, the prime minister wrote “excellent”.
The completion of Anji Khad bridge, having a single pylon with a height of 331 metres above the river bed on Udhampur-Srinagar-Baramulla Rail Link (USBRL), is yet another major breakthrough achieved by the Indian Railways, which is expecting to complete the Rs 37,000 crore project by the end of this year.
Minister of State for Railways Darshana Vikram Jardosh, who recently inspected the USBRL project by visiting various key locations including Anji Khad bridge and the nearby iconic Chenab bridge, termed the completion of the country’s first cable-stayed bridge as “another milestone” despite difficult geographic conditions.
“I visited the bridge site and congratulated everyone for successfully installing all 96 cables of the bridge in a record time of 11 months. This asymmetrical cable-stayed bridge crosses the deep gorges of Anji river, a tributary of river Chenab,” she said.
Jardosh said the bridge connects tunnel T2 on the Katra side and Tunnel T3 on the Reasi side.
“It has been the PM’s vision to make Indian railways the best in the world. Overcoming geographic and climatic challenges, our engineers and railway officials have conquered the invincible,” the minister said.
Described as a “true engineering marvel”, the bridge has 48 cables each on lateral and central spans with work on its pylon started in 2017, officials said, adding the pylon is standing 191 metre from its foundation level.
They said It is the second highest railway bridge after the iconic arch bridge over Chenab at Kauri, which is the highest railway bridge in the world being 359 metres above the river bed level — 35 metres higher than the iconic Eiffel tower in Paris.
Anji Khad bridge has a total length of 473.25 metres, while the length of the viaduct is 120 metres. The central embankment has a length of 94.25 meters, the officials said.
They said the bridge has been designed to handle heavy storms of strong winds and even explosions.
In October 2016, the Railways decided to build a cable-stayed bridge at Anji Khad after the plan to build an arch bridge similar to Chenab bridge was abandoned due to vulnerability of the structure, primarily due to concerns over geological stability of the region.
The Railway Ministry sanctioned the construction of the railway line from Udhampur to Baramulla via Srinagar in phases — 25-km Udhampur to Katra in 1994, 118-km Qazigund to Baramulla and 129-km Katra to Qazigund in 1999.
In view of the importance of the USBRL in providing seamless and hassle-free connectivity to Kashmir, the 272-km-long rail link was declared as a “National Project” in 2002.
Out of the total 272-km USBRL project, 161-km was commissioned in phases with first phase 118-km Qazigund-Baramulla section commissioned in October 2009, followed by 18-km Banihal-Qazigund in June 2013 and 25-km Udhampur-Katra in July 2014. The work on 111-km Katra-Banihal stretch is going on.

 

Agencies

Agencies

Related Posts

India Set To Become Drug Free By 2029: HM Amit Shah

Partition Dark Chapter In History; Country Had To Pay Heavy Price For It, Says HM Shah
by Agencies
November 7, 2026

Says “People Engaged In Drugs Will Go To Jails” India freed from Naxalism under PM Modi” Srinagar | Nov, 06:...

Read moreDetails

LG Sinha hails inscription of Rajatarangini, Mahabharata , Arthasastra in UNESCO register

LG reviews preparations for observance of Rashtriya Ekta Diwas
by K H News Service
November 7, 2026

Says “ A Product Moment, A Milestone For J&K UT” Srinagar | Nov, 06: Lieutenant Governor Manoj Sinha on Friday...

Read moreDetails

UNESCO recognition of Rajatarangini proud moment for J&K: CM Omar

CM Omar Abdullah greets people on Urs of Sheikh-ul-Alam (RA)
by K H News Service
November 7, 2026

Says “A global acknowledgement Of J&K’s historical, cultural legacy a milestone moment” Srinagar | Nov, 06:Chief Minister Omar Abdullah on...

Read moreDetails

NC reaches out to dissenters, promises corrective steps to defuse internal discontent

Dr Farooq, CM Omar greet people on 77th Republic Day
by Agencies
November 7, 2026

Two-hour Gupkar meeting brings legislators and top leadership together; Portfolio changes, party restructuring and coordination with govt figure in discussions...

Read moreDetails

Dal Lake’s floating post office goes beyond daylight, Doors Open till 9.00 P.M

Dal Lake’s floating post office goes beyond daylight, Doors Open till 9.00 P.M
by Irfan Yattoo
November 7, 2026

• In a bid to make postal services more accessible, • Department of Posts extends working hours of iconic Nehru...

Read moreDetails

CIK Conducts Multi-Location Raids Across Kashmir in Terror Recruitment Case

CIK Nabs 12 in Kashmir Terror-Link Sting
by Agencies
November 7, 2026

Srinagar | November 06: The Counter Intelligence Kashmir (CIK) wing of the Jammu and Kashmir Police conducted searches at approximately...

Read moreDetails
Srinagar WEATHER

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire