Srinagar: The Office of Chief Engineer, EM&RE Wing, Kashmir Saturday informed that 33 KV Safapora feeder would be shutdown on 10th February 2019 from 9 am to 5 pm to facilitate the laying and stringing work of the 132 KV BBTL between dead-end tower and gantry at Bamdpora Grid Station.
Man Dies, Wife Injured in Doda Electric Shock
Doda | November 14: A 65-year-old man died and his wife sustained injuries after the couple suffered an electric shock...
Read moreDetails



