Tue. Aug 20th, 2019

Power shutdown in Kashmir parts

Srinagar: The Office of Chief Engineer, EM&RE Wing, Kashmir Saturday informed that 33 KV Safapora feeder would be shutdown on 10th February 2019 from 9 am to 5 pm to facilitate the laying and stringing work of the 132 KV BBTL between dead-end tower and gantry at Bamdpora Grid Station.

Loading...

Leave a Reply

Your email address will not be published. Required fields are marked *

The Kashmir Horizon

FREE
VIEW