• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Saturday, August 8, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

PM Modi’s PRAGAT Flagship Platform Revived, Delivered India’s Longest Rail-Cum-Road Bridge

Agencies by Agencies
January 7, 2026
in Top News
A A
PM Modi’s PRAGAT Flagship Platform Revived, Delivered India’s Longest Rail-Cum-Road Bridge
Share on FacebookShare on TwitterWhatsappTelegramEmail

4. 9 Kilometers Lonf Bogibeel bridge the lifeline of north east connects Assam withArunachal

PRAGATI led to commissioning of critical projects like Bogibeel Rail cum Road Bridge over river Brahmaputra: Cabinet Secy

Bridge plays a critical role in strengthening national security, strategic preparedness in eastern region by facilitating swift movement of defence forces, their equipment

New Delhi: Prime Minister’s flagship platform for Pro-Active Governance and Timely Implementation, PRAGATI, has marked a significant milestone with the successful conduct of its 50th meeting. Since its launch by Prime Minister Narendra Modi in 2015, PRAGATI has transformed governance by enabling real-time monitoring and resolution of key infrastructure projects and public grievances through direct Prime Ministerial review.

The platform exemplifies cooperative federalism, bringing together the Centre, States, and Union Ministries on a single digital interface. Over a decade, PRAGATI has helped accelerate decision-making, resolution of issues causing delay in key infrastructure projects, and instilled a strong culture of accountability. Today, in this special series, we take a look on Bogibeel Rail-cum-Road Bridge over the river Brahmaputra.

India’s longest and Asia’s second longest rail-cum-road bridge, Bogibeel bridge, is the lifeline of the north eastern part of the country and facilitates connectivity between Assam and Arunachal Pradesh. The 4.9-kilometre-long bridge has boosted connectivity for around 50 lakh people residing in Upper Assam and Arunachal Pradesh. The project was sanctioned in 1997-98, while the work commenced on 21st April, 2002, under the Atal Bihari Vajpayee-led government.

Even after nearly 13 years since the commencement of construction, the Bogibeel Bridge project had achieved only 72 per cent physical progress, while the cost escalated by five times. The Prime Minister Narendra Modi reviewed this project in PRAGATI in May 2015.

Recognising its critical role in regional connectivity and national security, the Prime Minister directed that the project should be taken up in mission mode. It was only after Prime Minister Modi’s intervention that the pace of work accelerated, leading to the completion of the bridge on 25th December, 2018. Cabinet Secretary T V Somanathan said that PRAGATI has helped the commissioning of critical projects like Bogibeel Rail cum Road Bridge over the river Brahmaputra.

The Bogibeel Rail-cum-Road Bridge plays a critical role in strengthening national security and strategic preparedness in the eastern region by facilitating the swift movement of defence forces and their equipment. The bridge has also ensured swift, uninterrupted, and all-weather connectivity across the Brahmaputra.

 

 

Agencies

Agencies

Related Posts

Major boost to water supply, sanitation as CM Omar unveils ₹140-cr projects

Major boost to water supply, sanitation as CM Omar unveils ₹140-cr projects
by K H News Service
August 8, 2026

Udhampur: Chief Minister Omar Abdullah on Friday laid the foundation stones for two major infrastructure projects worth over ₹140 crore...

Read moreDetails

CM Omar launches J&K AI Centre of Excellence, dedicates Project Phoenix at IIT Jammu

CM Omar launches J&K AI Centre of Excellence, dedicates Project Phoenix at IIT Jammu
by K H News Service
August 8, 2026

Says “Initiatives to strengthen AI-driven governance, innovation, entrepreneurship” Jammu : Chief Minister Omar Abdullah Friday launched the J&K Artificial Intelligence...

Read moreDetails

CM inspects NH-44 restoration, stresses early reopening of vulnerable stretches

CM inspects NH-44 restoration, stresses early reopening of vulnerable stretches
by K H News Service
August 8, 2026

• Directs NHAI, Traffic Police and executing agencies to expedite repairs and strengthen coordination • Stresses uninterrupted movement of fruit-laden...

Read moreDetails

CM inaugurates upgraded Residency Road–High Street corridor in Jammu

CM Omar Abdullah terms Punjab livestock vehicle levy ‘unjust’, seeks Mann’s intervention
by K H News Service
August 8, 2026

Jammu: Chief Minister Omar Abdullah on Friday inaugurated the upgraded Residency Road–High Street corridor in Jammu, a ₹9.18-crore urban infrastructure...

Read moreDetails

USBRL drives Kashmir into new growth corridor; more rail projects in pipeline: Centre

USBRL drives Kashmir into new growth corridor; more rail projects in pipeline: Centre
by Irfan Yattoo
August 8, 2026

Rail Minister says all-weather rail link is opening national markets for Kashmir's apples, handicrafts and MSMEs Surveys cleared for Jammu–Poonch...

Read moreDetails

₹950 Cr disbursed under central industrial schemes in J&K, 918 units registered: Govt

J&K Govt appoints 49 dependents under Rehab Assistance Scheme
by Irfan Yattoo
August 8, 2026

292 industrial units begin production; around 29,000 jobs projected 1,628 DPIIT-recognised startups, 18 GI-tagged traditional crafts boost local economy NCSS-2021...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire