• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Friday, October 2, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Opinion Editorial

Macadam Cracks On Srinagar Roads

From Editor's Desk by From Editor's Desk
October 28, 2025
in Editorial
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

“The purpose of macadamisation (creating durable, all-weather roads) is often being defeated because newly laid roads are crumbling within weeks. This premature deterioration suggests the cause is something other than the typical excuses of weather or heavy traffic.”

The recent reports of macadamisation works in Srinagar city developing cracks merely a few months after completion have once again exposed the alarming state of civic infrastructure management under the Srinagar Municipal Corporation (SMC). What should have been a symbol of progress and modernization has instead turned into a glaring example of inefficiency, negligence, and poor accountability in public works. The very purpose of macadamisation — provide durable, all-weather roads that can withstand traffic and climate conditions — is being defeated when freshly laid roads begin to crumble within weeks. Such premature deterioration cannot be explained away by the usual excuses of weather or heavy vehicular load. Rather, it points directly to compromised quality of materials, lack of technical supervision, and possibly collusion between contractors and officials. When crores of rupees from the public exchequer are spent annually on resurfacing and repairing city roads, citizens have every right to demand durability, transparency, and accountability. Equally worrying are the mounting complaints about the drainage works undertaken by the drainage division of the SMC. Several localities that were recently declared “upgraded” continue to face water logging even after a mild downpour. Poorly designed or hastily executed drainage systems not only inconvenience residents but also cause long-term damage to roads and surrounding infrastructure. The recurrence of such issues year after year reflects not an isolated failure but a systemic breakdown in how civic projects are planned, implemented, and monitored. At the heart of this crisis lies the lack of a robust inspection and audit mechanism within the SMC.

“The Srinagar Municipal Corporation (SMC) must implement stringent quality control for public works (roads, drains) to achieve “smart city” status and restore public trust. This requires third-party audits, transparent reporting, disciplinary action for failing officers, and blacklisting of substandard contractors. Furthermore, the SMC needs to foster civic accountability through public inspections, citizen feedback, and open data to mend the growing rift in public faith.”

Engineering divisions appear to function in silos with minimal oversight and negligible post-completion evaluation. Tendering and work allotment processes are often shrouded in opacity, and there is little to no independent technical audit of the quality or lifespan of executed works. The absence of accountability emboldens inefficiency — and the cost is borne by ordinary citizens who navigate damaged roads, flooded streets, and disrupted services. Srinagar, being the summer capital and a fast-growing urban centre, deserves civic infrastructure that meets modern standards. A city aspiring for “smart city” status cannot afford roads that crumble in months or drains that overflow with the first rain. The SMC leadership must therefore institute stringent monitoring systems, third-party quality audits, and transparent reporting of all public works. Officers responsible for repeated failures should face disciplinary action, and contractors who deliver substandard work must be blacklisted. Beyond punitive measures, the corporation must embrace a culture of civic accountability. Periodic public inspections, citizen feedback mechanisms, and open data on ongoing projects can help rebuild public trust. Civil engineers and urban planners must be empowered and made accountable in equal measure. The people of Srinagar are not asking for miracles — only for roads that last, drains that function, and a municipal corporation that works with integrity. The cracks appearing on Srinagar’s roads are not just in the asphalt — they represent the widening cracks in public faith. It is time the SMC fixed both.

 

From Editor's Desk

From Editor's Desk

Related Posts

Private Schools Outmaneuver Headless FFRC

Digital Building Permits: From Promise to Reality
by From Editor's Desk
October 1, 2026

“Unapproved fee hikes by private schools highlight a glaring regulatory failure, made worse by the FFRC going chairperson-less for nine...

Read moreDetails

Beyond J&K’s Digital Records

Digital Building Permits: From Promise to Reality
by From Editor's Desk
September 30, 2026

“While Jammu and Kashmir’s rectification of 1.3 million land record errors is a major step, its success hinges on providing...

Read moreDetails

Market Checks In J&K : Stalled, Suspended 

Digital Building Permits: From Promise to Reality
by From Editor's Desk
September 29, 2026

“Suspension of FCS&CA market inspections for four years has led to rampant price inflation, adulteration, and poor quality in essential...

Read moreDetails

Untangle NOCs, School Association Brands

Digital Building Permits: From Promise to Reality
by From Editor's Desk
September 26, 2026

“Recognizing private schools as partners rather than profits cuts red tape, but it ignores a critical blind spot: unregulated school...

Read moreDetails

Democracy Thrives On Scrutiny, Not Stalls

Digital Building Permits: From Promise to Reality
by From Editor's Desk
September 23, 2026

“More than a political arena, the Jammu and Kashmir Legislative Assembly is the voice of the people and the guardian...

Read moreDetails

Classroom Learning:  Beyond 5-Day School Week

Digital Building Permits: From Promise to Reality
by From Editor's Desk
September 22, 2026

“A proposed five-day school week in Jammu and Kashmir, aimed at reducing student stress, is under review by education authorities...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW