• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Thursday, July 23, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Region

Power Shutdown on Oct 14, 20 in Kashmir parts

K H News Service by K H News Service
October 11, 2025
in Region
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar | :  According to the Chief Engineer, Distribution, KPDCL, in order to carry branch cutting and routine preventive maintenance works coming under 33 KV lines, shutdown of 33 Kanipora-Keller line will be observed due to which Keller, Kanipora and Shadimarg receiving stations shall remain off while power supply to Shadimarg, Kalampora, Drabgam, Shirmal, Nadpora and adjoining areas will be affected from 10.00 AM to03.00 PM on 14 & 20 October, 2025.

Similarly, shutdown of 33 KV Kanipora-Aglar line will be observed due to which IGC Aglar receiving station shall remain off while power supply to IGC Aglar will be affected from      10.00 AM to 02.00 PM on 15 October, 2025.

Likewise, shutdown of 33 KV Kanipora-Pinjoora line will be observed due to which Arhama, Pinjoora and chowdrigund receiving stations will remain off and power supply to Pahnoo, Trenz, Imam Sahib, Arahama, Town, Bongam, Shopian, Pinjoora, Reshinagri, Vehil, Nowgam and adjoining areas will be affected from 10.00 AM to 03.00 PM on 13, 16 & 23 October, 2025.

As per separate shutdown schedule by the Chief Engineer, Distribution, KPDCL, shutdown of 33 KV Handwara old line will be observed due to which Adoora, Zachaldara and Changimulla receiving stations shall remain off while  power supply to Hanga, Haril, Changimulla, Wadder, Rajpora and adjoining areas will be affected on  13, 16 & 20 October, 2025 from 10.00 AM to  03.00 PM.

Likewise, shutdown of 33 KV Kupwara Hot line will be observed due to which Tikker, Drugmulla and Galizoo receiving stations shall remain off while power supply to Kupwara Town, Gulgam, Batergam, Drugmulla, DC Complex and adjoining areas will be affected on  14 October, 2025 from 10.00 AM TO 03.00 PM.

Similarly, shutdown of 33 KV Handwara Town line will be observed due to which Handwara, Pohrupeth and Chogal receiving stations shall remain off while power supply to Handwara Town, Marathgam, Kultoora, Pohrupeth, Kulangam, and Chogal will be affected on  15& 22 October, 2025 from10.00 AM TO 03.00 PM.

Furthermore, shutdown of 33 KV Machil Tapline will be observed due to which Machil receiving station shall remain off while power supply to Machil, Dapal, Ring Bala, Chountiwari and adjoining areas will be affected on  18 October, 2025 from10.00 AM TO 03.00 PM.

Likewise, shutdown of 33 KV Hyhama line shall be observed due to which Trehgam, Karihama, &Hyhama shall remain off while Trehgam, Zurhama, Hyhama, Gushie, Dedikoot and adjoining areas will be affected on  18 October, 2025 from10.00 AM TO 03.00 PM.

Similarly, shutdown of 33 KV Dolipora line will be observed due to which Vilgam, Tarathpora, and Magam receiving stations shall remain off while Magam, Tarathpora, Vilgam, Dolipora and adjoining areas will be affected on  13 October, 2025 from10.00 AM TO 03.00 PM.

Meanwhile, shutdown of 33 KV Kralpora line will be observed due to which Kralpora, Panzgam, Tangdar, Teetwal, and Keran shal remain off while power supply to Kralpora, Chowkibal, Harrie, Tangdar, Teetwal, Panzgam,and  Keran will be affected on  13 October, 2025 from10.00 AM TO 03.00 PM.

Similarly, shutdown of  33 KV TangdarTapline will be observed due to which Tangdar and Teetwal receiving stations will remain off while Tangdar, Taad, Teetwal and adjoining areas will be affected on  15& 20 October, 2025 from 10.00 AM TO 03.00 PM.

Likewise, shutdown of 33 KV Keran Tapline will be observed due to which Keran receiving station will remain off while Keran, Kalas, Kundiyan and adjoining areas will be affected on  16& 22 October, 2025 from10.00 AM TO 03.00 PM.

K H News Service

K H News Service

Related Posts

Div Com(J) , IGP(J)  review relief operations in flood-hit Poonch, Meet bereaved families in Sangla village

Div Com(J) , IGP(J)  review relief operations in flood-hit Poonch, Meet bereaved families in Sangla village
by K H News Service
July 22, 2026

Officers directed to speed up restoration of services   Poonch| July, 21:Divisional Commissioner Jammu Ramesh Kumar and Inspector General of...

Read moreDetails

Three leopards captured after three-month operation in Budgam

Three leopards captured after three-month operation in Budgam
by K H News Service
July 22, 2026

Wildlife Department restores safety in Ompora   Budgam| July, 21:The Wildlife Department has safely captured three leopards from Ompora in...

Read moreDetails

Resident Commission organizes awareness prog on Dogra tradition ‘Rutt Raahde’ at New Delhi

Resident Commission organizes awareness prog on Dogra tradition ‘Rutt Raahde’ at New Delhi
by K H News Service
July 22, 2026

New Dehli| July, 21:The Jammu and Kashmir Resident Commission, New Delhi, organized an awareness programme on the forgotten Dogra tradition...

Read moreDetails

Rajouri admin rescues 230 flood-hit residents, 450 housed in relief camps

Rajouri admin rescues 230 flood-hit residents, 450 housed in relief camps
by K H News Service
July 22, 2026

DC Says “Search continues for one missing person” People asked to follow weather advisories   Rajouri| July, 21:Deputy Commissioner Rajouri...

Read moreDetails

DC Kathua visits vulnerable locations to review situation amid incessant rains

DC Kathua visits vulnerable locations to review situation amid incessant rains
by K H News Service
July 22, 2026

Kathua| July, 21:Deputy Commissioner Kathua Rajesh Sharma Tuesday visited vulnerable locations across the district, including LogateMorh, Ujh Barrage, Tarnah Nallah,...

Read moreDetails

CMO Doda inspects CHC Thathri, reviews healthcare services

CMO Doda inspects CHC Thathri, reviews healthcare services
by K H News Service
July 22, 2026

Doda| July, 21:Chief Medical Officer Doda Dr Vinod Sharma inspected Community Health Centre Thathri and reviewed its operations. Block Medical...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire