• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Friday, June 26, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Business

Power Shutdown  in North Kashmir parts

KH Business Desk by KH Business Desk
October 5, 2025
in Business
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar | :  According to the Chief Engineer, Distribution, KPDCL, in order to carry out the replacement of 132 KV CB of 80 MVA Transformer at Grid Station Amargarh, shutdown of 33KV Arampora Feeder shall be observed due to which Arampora, Pazipora, Sher Colony Bugoo Receiving stations shall remain off while power supply to Arampora, Pazipora, Sher Colony, Bugoo and adjoining areas will be affected from 08:30 AM to 03:00 PM on 6th October, 2025.

Similarly, in view of shifting of electrical utilities along the road and LT AB Cabling by RDSS, shutdown of 33 KV Wangipora-Batwina Tap line shall be observed due to which receiving station Batwina, Wangipora and Nowgam, shall remain off while power supply to Batwina, Nowgam, Wangipora, Zazna, Ahan, Waskura, Kharbagh, Sumbal, Nesbal, and adjoining areas will be affected from 10:00 AM to 3:00 PM on 9th October, 2025 and 13th October, 2025.

Also in this connection, shutdown of 33KV Army Hakbara line shall be observed due to which receiving station Hakbara, Hajin, Preng, Madhwan and Army shall remain off while power supply to Hajin, Preng, Madhwan, Banyari, Hakbara, Chendergeer and adjoining areas will be affected from 10:00 AM to 3:00 PM on 8th October, 2025.

Further, shutdown of 33 KV Preng Madwan (Hajin Tapline) shall be observed due to stabilization of said line by way of installation of ST poles at Hakbara Village, due to which receiving station Hajin shall remain off while power supply to Hajin, Shahgund, Saudnara and adjoining areas will be affected from 10:00 AM to 3:00 PM on 8th October, 2025.

As per a separate shutdown schedule issued by the Chief Engineer, Distribution, KPDCL, in order to carry out Branch cutting/ pruning of trees coming in the corridor of 33 KV lines, shutdown of 33 KV Wanganpora-Soura-SKIMS Line shall be observed due to which receiving station Soura, Zoonimar shall remain off while power supply to Soura, Zoonimar, Nowshehra, Buchpora, Anchar and adjoining areas will be affected from 9:30 AM to 4:00 PM on 16th October, 2025.

Similarly, shutdown of 33 KV Habak-Owantabhawan-SKIMS Line shall be observed due to which receiving station Owantabhawan shall remain off while power supply to Owantabhawan, Lalbazar and adjoining areas will be affected from 9:30 AM to 4:00 PM on 10th October, 2025.

Likewise, shutdown of 33 KV Waganpora-Khanyar- Rainawari Line shall be observed due to which receiving station  Khanyar, Rainawari    shall remain off while power supply to Miskeen Bagh, Makhdoom Sahib, Rozabal, Hazaribagh, Kondabal, Hassanabad, Jogilankar and adjoining areas will be affected  9:30 AM to 4:00 PM on 8th  October, 2025.

Further, shutdown of 33 KV WanganporaTakanwariLine  shall be observed due to which receiving station Takanwari    shall remain off while power supply to  Shanglipora, Palpora, Sangam and adjoining areas   will be affected from 9:30 AM to 4:00 PM on 8th October, 2025.

Similarly,  shutdown of 33 KV GIS Khanyar-BAMK Line shall be observed due to which receiving station BAMK shall remain off while power supply to  Industries, Raja Colony, BSNL, Nowshehra, Botakadal, Gilli Kadal, Zadibal and adjoining areas will be affected from 10:00 AM to 2:00 PM on 9th October, 2025.

Similarly, shutdown of 33 KV Alusteng-Zakura Line shall be observed due to which receiving station Ahmednagar, Gulab bagh &Umerhaire shall remain off while power supply to  Ahmadnagar, Umerheir, Gulab bagh, Pandachh&Khalmulla and adjoining areas   will be affected from 9:30 AM to 4:00 PM on 11th October, 2025.

Similarly,  shutdown of 33 kV Habak Zakura-Burzuhama Line shall be observed due to which receiving station Zakura and Burzhama shall remain off while power supply to   Zakura, Batpora, Gulab bagh, Burzhama, Chaterhama,Tailbal, Danihama, Khimber, Shuperbagh and adjoining areas   will be affected from 9:30 AM to 4:00 PM on 12th October, 2025.

Likewise,  shutdown of 33 kV Habak-Hazratbal line shall be observed due to which receiving station Habak& Hazratbal shall remain off while power supply to  Hazratbal, Umer colony, Rangpora, BARC, Habak, KU, Nigeen,  Kanitar, NIT, Shrine and adjoining areas  will be affected from 9:30 AM to 4:00 PM on 12th October, 2025.

Similarly,  shutdown of 33 kV Habak-Lalbazar Line shall be observed due to which receiving station Lalbazar and Baghwanpora shall remain off while power supply to  Lalbazar, Molvistop, Botashah Mohalla, Sikhbagh, Amdakadal, Botakadal, Baghwanpora and adjoining areas will be affected from 9:30 AM to 4:00 PM on 14th October, 2025.

Similarly, shutdown of 33 KV GIS Khanyar-Kathidarwaza Line shall be observed due to which  receiving station Khatidarwaza shall remain off while power supply to Saida kadal, Kathidarwaza, Mir Behri  Niadyar, Pokhribal and adjoining areas   will be affected from 9:30 AM to 4:00 PM on 14th October, 2025.

Likewise, shutdown of 33 KV Khunmoh-SIDCO-II Line shall be observed due to which receiving station Foodpark,  Khunmoh Phase-III, BB Cantt. shall remain off while power supply to  Industrial Area, Khunmoh& B BCant will be affected from 9:30 AM to 4:00 PM on 19th October, 2025.

Similarly,  shutdown of 33 kV Khunmoh-SIDCO-I Line shall be  observed due to which receiving station Khunmoh old, Balhama, Wuyan,  TCI old, shall remain off while power supply to  Khunmoh, ,Wuyan, Balhama, TCI Old , Zafran colony, Chak sangria, JKAP, Befina, TCI wuyen and adjoining areas will be affected from 9:30 AM to 4:00 PM on 22nd  October, 2025.

Fruther, shutdown of 33 kV Pampore-Badamibagh Line/ 33 KV Panthachowk-Pampore Line shall be observed due to which stations Badamibagh, Sonwar, Tangnar WSS, Govt. Press, G.B.Panth, Panthachowk&Lasjan shall remain off while power supply to  Sonwar, Shivpora, Indra nagar, badamibagh, WSS Tangnar, Panthachowk, Lasjan, Summerbugh, Govt. Press, Floor mills will be affected from 9:30 AM to 4:00 PM on 25th October, 2025 and 29th October, 2025.

Similarly, shutdown of 33 kV Cheshmashahi-Brein-Nishat Line/ 33 KV Cheshmashahi Shalimar line shall be observed due to which receiving station Brein & Nishat shall remain off while power supply to  Dal band, Brein, Tuilip garden, Pahloo, Taj vivanta, BSNL, Nishat, Foreshore, Panthanbagh, Filteration Plant and adjoining areas will be affected from 9:30 AM to 4:00 PM on 15th October, 2025 and 20th October, 2025.

Moreover, shutdown of 33 kV Cheshmashahi- Centaur shall be observed due to which receiving station Centaur shall remain off while power supply to Zabarwan&Rajbhawan and adjoining areas will be affected from 9:30 AM to 4:00 PM on 16th October, 2025.

Similarly,  shutdown of 33 kV Cheshmashahi- TRC-Nedous Lines hall be observed due to which receiving station TRC04,CEN01 (Zabarwan) shall remain off from 9:30 AM to 4:00 PM, receiving station SN04, TRC06, TRC05,TRC01 shall remain off from 10:00 AM to 2:00 PM & SN04, TRC06, TRC05,TRC01 from 10:00 AM to 12:00 Noon,   while power supply to  TRC, Nedous, Sonwar, Zabarwan, Dalagate, CD Hospital and adjoining areas will be affected  on 23rd  October, 2025.

Similarly, shutdown of 33 kV Bemina- B.B Shah Line/33 kV BeminaFatehkadal Line shall be observed due to which receiving station Basantbagh, B.B Shah, Fatehkadal& Khayam shall remain off while power supply to Basant bagh, Maisuma, Nai-sarak, B.B shah, X-change, KK Mohalla, Nowpora, Bohrikadal, Gousia Hospital, Car Parking, B.B shah, Babademb, Bishembar Nagar, DY. CM, and adjoining areas will be affected from 9:30 AM to 4:00 PM on 28th October, 2025.

Likewise, shutdown of 33kV GIS Theed-Harwan & 33KV GIS Theed-Shalimar shall be observed due to which receiving station Harwan & Shalimar shall remain off while power supply to Theed, Chandpora, Dara, Darbagh, SKAUST, Tailbal,Aharbal,Deewan Colony and adjoining areas will be affected from 9:30 AM to 4:00 PM on 13th October, 2025.

Further, shutdown of 33 KV Wanganpora -Kawdara&Wanganpora – S.H pora shall be observed due to which receiving station Kawdara& Mughal Masjid shall remain off while power supply to Kawdara, Nawakadal, Rajouri kadal, Bachidarwaza, Zadibal, Firdous colony, Mughal Masjid, Jamia Masjid and adjoining areas will be affected from 9:30 AM to 4:00 PM on 27th October, 2025.

Moreover, shutdown of 33 KV Cheshmashahi-Buchwara Line shall be observed due to which receiving station Buchwara shall remain off while power supply to BB-cant Tap Line, Nehru park, Dalgate, Dal, Zabarwanetc.will be affected from 9:30 AM to 4:00 PM on 19th October, 2025.

Similarly, to carry out the work of stabilization of the essential feeder emanating from Receiving Station Budgam, 33 KV Budgam SIDCO line shall be observed due to which receiving station Budgam, SIDCO, Railway shall remain off while power supply to Budgam Town, Ompora, Housing Colony, Nasrullahpora, Jawalpora and adjoining areas will be affected from 9:00 AM to 3:00 PM on 5th October, 2025.

Likewise, shutdown of 33 KV Awantipora-Tral-II line shall be observed due to which receiving station Gulabagh, Batagund, Lurgam and Aripalshall remain off while power supply to Taki, Batagund, Aripal, Nanar, Pastuna, Wagad, Sathoora and adjoining areas will be affected from 9:00 AM to 3:30 PM on 8th October, 2025.

KH Business Desk

KH Business Desk

Related Posts

Javid Dar inaugurates Centre of Excellence for Lavender, Aromatic Crops at Srihama, Anantnag

Javid Dar inaugurates Centre of Excellence for Lavender, Aromatic Crops at Srihama, Anantnag
by KH Business Desk
June 26, 2026

Annatnag : Minister for Agriculture Production, Rural Development and Panchayati Raj, Cooperatives and Election Department, Javid Ahmad Dar, Thursday  inaugurated...

Read moreDetails

Javid Dar Attends Virtual Release Of PM-Kisan 23rd Instalment,Ut Event Held At SKUAST-Kashmir

Javid Dar Attends Virtual Release Of PM-Kisan 23rd Instalment,Ut Event Held At SKUAST-Kashmir
by KH Business Desk
June 21, 2026

Srinagar :Minister for Agriculture Production, Rural Development and Panchayati Raj, Cooperatives and Election Department, Javid Ahmad Dar, Saturday attended the...

Read moreDetails

J&K Bank commissions Easy Banking Unit at Mankote, Poonch

J&K UTLBC to organize special facilitation camps in Ang, Poonch, Rajouri, Reasi to help people reclaim their unclaimed financial assets
by KH Business Desk
June 21, 2026

Srinagar :Continuing its efforts to extend convenient financial services to remote areas, J&K Bank commissioned a new Easy Banking Unit...

Read moreDetails

CM’s Advisor Nasir Aslam Wani inaugurates Mothercare, adidas Kids, ASICS stores in Srinagar

CM’s Advisor Nasir Aslam Wani inaugurates Mothercare, adidas Kids, ASICS stores in Srinagar
by KH Business Desk
June 21, 2026

 Says “Launch of global retail brands marks major boost to Srinagar’s growing retail sector”   Srinagar : Nasir Aslam Wani,...

Read moreDetails

Lead Bank Bandipora, CFL organise Special Night Awareness Camp on Financial Inclusion for Fishermen

by KH Business Desk
June 21, 2026

Bandipora :On the directions of the Deputy Commissioner Bandipora, Indu Kanwal Chib, a Special Night Awareness Camp on Financial Inclusion...

Read moreDetails

Dir Horticulture Jammu reviews physical, financial progress of dev schemes

Dir Horticulture Jammu reviews physical, financial progress of dev schemes
by KH Business Desk
June 21, 2026

Jammu :Director Horticulture Jammu Gul Syed Saturday chaired a review meeting at the Conference Hall of the Directorate of Horticulture,...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW