• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Thursday, October 22, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Region

DC Kulgam reviews power sector, RDSS projects

K H News Service by K H News Service
May 23, 2025
in Region
A A
Block Diwas: DC presides over Grievances Redressal Camp at Kulgam, listens to issues of public for redressal
Share on FacebookShare on TwitterWhatsappTelegramEmail

Kulgam: In order to assess the progress of ongoing works under the Revamped Distribution Sector Scheme (RDSS), a meeting was chaired by the Deputy Commissioner (DC) Kulgam, AtharAamir Khan at the mini-secretariat Kulgam.
During the meeting, Chief Manager Power Grid briefed the DC on the status of ongoing projects in the district.
It was informed that the RDSS, with a project cost of Rs 113 crore, aims to strengthen the power distribution infrastructure in the district by installing 618 new distribution transformers and 330 km of LT Aerial Bundled Cables (ABC) and 450 km of HT reconductor Circuit kmts.
It was further apprised the initiative is designed to reduce Aggregate Technical and Commercial (AT&C) losses in Kulgam.
Through a powerpoint presentation it was given out that 57% progress has been made in installation of HT/LT electric poles while 62% in cabling and 10% in conductor laying has been completed against the work allotted which ultimately leads to accumulative physical progress of 36%.
DC expressed dissatisfaction with the delayed supply of distribution transformers and directed the concerned to expedite the delivery process to ensure timely completion of the project.
He instructed to mobilize men and machinery to ensure completion of projects well in time besides proper coordination between different departments.
The DC emphasized the importance of completing the works within the stipulated timeline to enhance the reliability and efficiency of the power distribution system in the district.
The meeting was also attended by ADC, Viqar Ahmed Giri; CPO ZahidSajad; Senior G M PGC, S E KPDCL Circle Bijbehara, Executive Engineers of KPDCL, STD Bijbehara, NH444 Sgr, Project Division Sgr, Project Wing (PGCIL) Tehsildars, AEEs and JEs and other Officers.

K H News Service

K H News Service

Related Posts

Div Com Kashmir directs Joint Recce to finalise Preparations for 3rd Edition of Kashmir Marathon

Div Com Kashmir directs Joint Recce to finalise Preparations for 3rd Edition of Kashmir Marathon
by K H News Service
October 22, 2026

Srinagar : Divisional Commissioner Kashmir, Anshul Garg, has stressed the need for a Joint Recce of the inaugural venue and...

Read moreDetails

City Municipal Commr Srinagar inspects Achan Landfill Site

City Municipal Commr Srinagar inspects Achan Landfill Site
by K H News Service
October 22, 2026

Dr Basharat reviews Waste Management Operations, Legacy Waste Bio-mining Project   Srinagar : Commissioner, Srinagar Municipal Corporation, Dr. Basharat Qayoom,...

Read moreDetails

Secy RDD reviews Progress of RDD Schemes in Ramban, Directs Expedited Implementation

Secy RDD reviews Progress of RDD Schemes in Ramban, Directs Expedited Implementation
by K H News Service
October 22, 2026

Ramban : Secretary Rural Development Department and Panchayati Raj, Ramesh Kumar, Wednesday  chaired a meeting to review the progress of...

Read moreDetails

DC Jammu inspects old city bazaars ahead of festive season

DC Jammu inspects old city bazaars ahead of festive season
by K H News Service
October 22, 2026

Jammu |Oct, 21: Deputy Commissioner Jammu Minga Sherpa Wednesday  conducted an extensive tour of different parts of the old city...

Read moreDetails

Electric Inspection Division trains over 80 linemen in electrical safety

Electric Inspection Division trains over 80 linemen in electrical safety
by K H News Service
October 22, 2026

‘Safety drive to be extended to all districts of Jammu Province’   Jammu : The Electric Inspection Division of the...

Read moreDetails

Basohli Investor meet attracts 70+ investors, highlights tourism, enterprise potential

Basohli Investor meet attracts 70+ investors, highlights tourism, enterprise potential
by K H News Service
October 22, 2026

Kathua : An exclusive investor meet was organised in Basohli as part of Basohli Utsav-2026, bringing together over 70 investors...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW