• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Thursday, November 12, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home News Shots

Power Shutdown In Kashmir Parts

K H News Service by K H News Service
March 5, 2025
in News Shots
A A
Power shutdown in Rajbagh Srinagar
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar : According to the Chief Engineer, Distribution, KPDCL, in order to carry out Installation of DTR structure and laying of LT Cable under RDSS, the shutdown of 33KV Habbak-Zakura-Burzhama Line shall be observed due to which Receiving Station at Zakura and Burzhama shall remain off while power supply to the Zakura, Batpora, Gulab Bagh, Danihama, Khimber, Chaterhama, Teilbal, Burzhama, Gassu, Shoperbagh and Rahbagh will be affected from 10:30 AM to 04:00 PM on 10 March, 2025.
Similarly, to carry out the erection of poles of 33 KV Tapline of Awantipora Line, the shutdown of 33KV Awantipora- Awantipora line shall be observed due to which 33/11KV Receiving Stations at DPL Awantipora and Floor Mills shall remain off while the power supply to DPL Awantipora and Floor Mills will be affected from 09:00 AM to 03:00 PM on 6 & 8 March 2025.
In order to carry out stabilization, erection of poles and preventive maintenance of 33KV line, the shutdown of 33KV Pampore-Khrew line shall be observed due to which 33/11KV Receiving Stations at Khrew-I, Khrew-2nd and Shar Shali shall remain off while power supply to the Khrew, Bathen, Shar, Wahab Sahab areas will be affected from 09:00 AM to 03:00 PM on 05 March, 2025.
Also, the shutdown of 33KV Pampore-Lethpora line shall be observed due to which 33/11KV Receiving Stations at Konibal, Lethpora, LIS Ladhoo and Mills shall remain off while power supply to the Samboora, Lethpora, Patalbagh, Chandhara, Konibal & Drusoo areas will be affected from 09:00 AM to 03:00 PM on 06 March, 2025.
Further, the shutdown of 33KV Pampore-Wagoora line shall be observed due to which 33/11KV Receiving Stations at Kadlabal and HPCL shall remain off while power supply to the Gas Turbine and HPCL areas will be affected from 09:00 AM to 03:00 PM on 05 March, 2025.
Meanwhile, to carry out the augmentation of conductor of 33 KV Pampore- Pulwama line, the shutdown of 33KV Pampore-Pulwama line shall be observed due to which 33/11KV Receiving Stations at Newa, Kakapora, LIS Marvel-I,II,III & IV shall remain off while power supply to the Kakapora, Newa, Gadoora, Parigam, Narbal, Ukhoo & Marvel areas will be affected from 09:00 AM to 03:00 PM on 06 & 08 March, 2025. However the essential feeder of affected Receiving Stations shall remain charged via Lassipora-Pulwama line & load shall run as per availability.
Moreover, to carry out stabilization and augmentation of 33 KV line, the shutdown of 33KV Pampore-Pampore line shall be observed due to which 33/11KV Receiving Stations at Pampore-I and Pampore-II shall remain off while power supply to the Pampore, Zewan, Tengan, JKEDI, ITBP areas will be affected from 09:00 AM to 03:00 PM on 05, 08 & 12 March, 2025.
Also, the shutdown of 33KV Pampore-SIDCO line shall be observed due to which 33/11KV Receiving Stations at Cement Plants of Khrew and IE Khrew shall remain off while power supply to IE Khrew & Cement Plants will be affected from 09:00 AM to 03:00 PM on 05, 08 & 12 March, 2025.
Further, the shutdown of 33KV Pampore-Badamibagh line shall be observed due to which 33/11KV Receiving Stations at Sonwar, Badamibagh, Panthachowk, Lasjan, WSS Tangnar shall remain off while power supply to Sonwar, Badamibagh, Panthachowk and Lasjan areas will be affected from 10:00 AM to 01:30 PM on 05 & 12 March, 2025.
In order to carry out erection of ST poles and laying of ACSR conductor under stabilization of 33 KV Pinjoora Line, the shutdown of 33KV Kanipora- Pinjoora line shall be observed due to which 33/11KV Receiving Stations at Pinjoora, Arhama and Chowdharygund shall remain off while power supply to Pinjoora, Arhama, Pahnoo, Trenz, Kilora, Imamsahib, Vehil, Reshinagri, Shirmal, Chowdrigund, Reshinagar & Saidpora areas will be affected from 09:00 AM to 03:00 PM on 06 & 09 March, 2025.
To facilitate upgradation of 33 KV Wanpoh SICOP line from 0.1 ACSR to 0.2 ACSR, the shutdown of 33KV Wanpoh SICOP Line shall be observed due to which 33/11KV Receiving Stations at Shamsipora, SICOP, Zirpara, Veeri, Cheniwader and Shuhul Flour Mill shall remain off while power supply to the Veer, Srigufwara, Zirpara, Shamsipora, Bijbehara-SICOP area and other adjoining areas will be affected from 09:00 AM to 03:30 PM on 08, 11, 13 & 16 March, 2025.

 

K H News Service

K H News Service

Related Posts

Early Snowfall, Rain Hit J&K, MeT Issues Weather Warning

Rain Breaks Unprecedented Dry Spell In Kashmir; Gulmarg Gets Season’s First Snowfall
by K H News Service
November 12, 2026

Srinagar | Nov, 11: Fresh snowfall in the higher reaches and rainfall across the plains marked the arrival of a...

Read moreDetails

GMC Handwara Cancels Provisional Admissions of Five MBBS Candidates

by K H News Service
November 12, 2026

Srinagar| Nov, 11: Government Medical College (GMC) Handwara has cancelled the provisional admissions of five MBBS candidates admitted under the...

Read moreDetails

Police Arrest Main Accused in Parigam Elderly Woman Murder Case

by K H News Service
November 12, 2026

Pulwama | Nov, 11: Police have solved the murder case of a 70-year-old woman killed inside her residence at Parigam...

Read moreDetails

Unconscious Man Found Dead at Reasi Residence

by K H News Service
November 12, 2026

Reasi | Nov, 11: A 31-year-old man was found dead at his home in the Pouni area of Reasi district...

Read moreDetails

13 Injured as School Bus Overturns in Pulwama

by K H News Service
November 12, 2026

Pulwama | Nov, 11: At least 11 students and two teachers were injured after a school bus overturned in the...

Read moreDetails

Man Electrocuted to Death at Home in Nagrota

by K H News Service
November 12, 2026

Jammu| Nov, 11: A 33-year-old man died after suffering an electric shock while operating electrical appliances at his home in...

Read moreDetails
Srinagar WEATHER

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW