• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Thursday, October 8, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Region

NHIDCL rebuts report about cracks on under construction Wardha bridge on Doda-Kishtwar axis of NH-244

K H News Service by K H News Service
April 6, 2024
in Region
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Kishtwar: The NHIDCL on Friday clarified the situation with accurate information against the recent reports circulating via local news agency regarding alleged cracks and damage to the under-construction Wardha bridge on Doda-Kishtwar axis of the NH-244.
It said that the currently under construction project adjacent to the old bridge at Wardha has encountered a temporary issue with the bottom PCC (Plain Cement Concrete) surface, which is not a structural component of the bridge itself.
The cracks on the PCC occurred due to heavy rainfall on March 29, 2024, and do not compromise the integrity of the bridge.
This temporary PCC layer was laid to facilitate construction efficiency (staging and shuttering for Superstructure Work) and will be dismantled after completing the superstructure, as part of standard engineering practices.
Additionally, the video circulated by a local news agency showcased the cracks on the existing bridge’s approach road is also misleading. The damage to the existing bridge’s approach road was caused by excavation work for the new bridge which was promptly addressed and repaired by the EPC Contractor of PMU-Kishtwar, NHIDCL, in collaboration with the district administration and traffic police officials on 27 September 2023.
The repaired approach road is now traffic-worthy, ensuring safe passage for heavy vehicles.
The circulated video has shown cracks on a sacrificial wall, which is a temporary structure and not load-bearing.
After constructing the new bridge adjacent to the existing one, both bridges will get connected by constructing a combined approach road.
The ongoing project works are meticulously supervised by experienced engineering experts, and regular inspections are conducted to maintain safety standards.
Also, the existing bridge has been load-tested by IIT Jammu in March 2023 to ensure its safety.
News agencies are advised to exercise diligence and responsibility in verifying information before dissemination to prevent unnecessary distress and inconvenience to the public. As fabricated or misleading news can harm public interest and undermine the efforts of organizations like NHIDCL.

K H News Service

K H News Service

Related Posts

Sakeena Itoo stresses skill development, demand-driven courses for youth

Sakeena Itoo stresses skill development, demand-driven courses for youth
by K H News Service
October 8, 2026

Kulgam :The Government Degree College (GDC) D H Pora, Wednesday  organized a programme on the theme “From Campus to Career”,...

Read moreDetails

MLA Bandipora visits HKM GDC, assures support for Infrastructure and student facilities

MLA Bandipora visits HKM GDC, assures support for Infrastructure and student facilities
by K H News Service
October 8, 2026

Baramulla : Member of Legislative Assembly (MLA), Bandipora, Nizam Uddin Bhat, Wednesday  visited HKM Government Degree College Bandipora for an...

Read moreDetails

DC Budgam distributes Free Spectacles to Students

DC Budgam distributes Free Spectacles to Students
by K H News Service
October 8, 2026

Budgam : Deputy Commissioner (DC) Budgam, Athar Aamir Khan, Wednesday  distributed free spectacles among students at a programme held at...

Read moreDetails

Distribution Camp under ADIP, RVY schemes held in Kulgam

Distribution Camp under ADIP, RVY schemes held in Kulgam
by K H News Service
October 8, 2026

Kulgam : Social Welfare Department, Kulgam, in collaboration with Artificial Limbs Manufacturing Corporation of India (ALIMCO), Wednesday  organised a distribution...

Read moreDetails

SWD Srinagar organizes Community Outreach Program under BBBP

SWD Srinagar organizes Community Outreach Program under BBBP
by K H News Service
October 8, 2026

Srinagar : Social Welfare Department (SWD), SANKALP-HEW Srinagar, organized a community outreach programme at Palpora, Srinagar, to sensitise the community...

Read moreDetails

MLA Shopian reviews Tourism Development Works

MLA Shopian reviews Tourism Development Works
by K H News Service
October 8, 2026

Kullay conducts extensive Field Inspection of Bohrihalan, Dubjan, Peer Ki Gali   Shopian : Member Legislative Assembly (M LA)  Shopian,...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire