• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Sunday, September 20, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Latest Update

Take Proactive Actions, Ensure No Load Shedding During Summer: Union Power Minister To Power Utilities

Agencies by Agencies
March 9, 2023
in Latest Update
A A
Take Proactive Actions, Ensure No Load Shedding During Summer: Union Power Minister To Power Utilities
Share on FacebookShare on TwitterWhatsappTelegramEmail

New Delhi|March, 9: The Government has asked power companies to ensure that there is no load shedding during the summer season and urged all stakeholders to take proactive actions to meet the rising electricity demand.
Union Power Minister R K Singh chaired a review meeting on March 7, with senior officials from Power, Coal and Railways ministries on various aspects in a bid to meet high electricity demand in the ensuing summer months.
During the meeting, Singh asked power companies to ensure that there is no load-shedding during the summer months, a power ministry statement said.
He asked all stakeholders to closely monitor the situation and take proactive actions to meet the electricity demand during the coming months.
He also asked the Central Electricity Authority to ensure that a fair and transparent mechanism is devised for allocation of coal to various States/UTs.
As per estimates of the Central Electricity Authority, the peak electricity demand is expected to be 229 GW during April this year. The demand then tapers off as monsoon season picks up from the southern part of the country and covers the whole country over the next 3-4 months, it said.
With GDP growing at close to 7 per cent, the power demand has been growing in the country at close to 10 per cent per annum, it added.
As per estimates, energy demand is expected to be 1,42,097 MU during April this year, highest in the year, before reducing to 1.41,464 MU in May and further declining to 1,17,049 MU during November, it said.
The power ministry has devised a multi-pronged strategy to ensure adequate availability of power during the upcoming summer months, it stated.
As part of the strategy, the power utilities have been directed to undertake maintenance for coal-based power plants well in advance so that no planned maintenance is required during the crunch period, it said.
Directions have already been issued under section-11 (of electricity act) to all imported coal-based plants to run at full capacity from March 16, 2023.
Adequate coal stocks would be made available at the coal-based power plants.
The Ministry of Railways agreed to provide 418 rakes to different subsidiaries of CIL, GSS and captive blocks and also enhance the number of rakes in due course so that sufficient coal stock can be maintained at power plants, it stated.
Gas-based power would be used to meet any peak demand, it stated.
The ministry has directed NTPC to run its 5,000 MW gas-based power stations during the crunch period in April-May.
In addition, 4,000 MW of additional gas-based power capacity would be added by other entities for availability during the summer months.
GAIL has already assured the Ministry of Power of the necessary supply of gas during the summer months.
All the hydro plants have been instructed to operate in consultation with RLDCs/SLDCs (Regional/State Load Dispatch Centers) to optimize water utilization in the current month for better availability during the next month.
An additional capacity of 2,920 MW would be available through new coal-based plants which would be commissioned by the end of this month.
In addition, after direction from the Ministry, two units at Barauni (2X110MW) will be made available during crunch period.

Agencies

Agencies

Related Posts

No permission sought or issued for proposed Gurez event: AD tourism gulmarg

No permission sought or issued for proposed Gurez event: AD tourism gulmarg
by KH Web Desk
September 19, 2026

SRINAGAR, SEPTEMBER 19: Assistant Director Tourism Gulmarg today clarified regarding social media post circulated through the twitter handle " Tantra...

Read moreDetails

Gurez ‘Tantra’ Retreat Sparks Controversy, Mehbooba, Mirwaiz Seek Government Intervention

Gurez ‘Tantra’ Retreat Sparks Controversy, Mehbooba, Mirwaiz Seek Government Intervention
by KH Web Desk
September 19, 2026

Srinagar, Sept 19: A proposed “Tantra in Silence” retreat in north Kashmir’s Gurez Valley has sparked controversy, with PDP president...

Read moreDetails

NC calls legislature party meeting tomorrow in Srinagar

NC calls legislature party meeting tomorrow in Srinagar
by KH Web Desk
September 19, 2026

Srinagar, Sep 19: The ruling National Conference has convened a meeting of its legislature party on Sunday afternoon to devise...

Read moreDetails

39 SDRF personnel granted promotion to higher pay scale

4 IPS officers promoted as ADGPs, Sheema gets time scale
by KH Web Desk
September 19, 2026

Srinagar, Sept 19: A Departmental Promotion Committee (DPC), chaired by DIG SDRF/Civil Defence Kashmir Imtiyaz Hussain Mir, on Friday cleared...

Read moreDetails

‘Youth Left in Limbo’: Iltija Mufti Hits Out at NC Govt Over Reservation Row

‘Youth Left in Limbo’: Iltija Mufti Hits Out at NC Govt Over Reservation Row
by KH Web Desk
September 19, 2026

PDP leader alleges two-year delay in releasing reservation panel report; questions government over jobs, age limits and representation of open...

Read moreDetails

Traffic cop dies after being hit by truck in Qazigund

60-Year-Old Dies After being hit In Uri Road Mishap
by KH Web Desk
September 19, 2026

Qazigund, Sept 19: A Traffic Police Head Constable was killed after being hit by a truck in Qazigund area of...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire