• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Monday, July 13, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home City News Jammu

74% work on Jammu Ring Road Project completed, Div Com(J) tours entire stretch

Jmu Div Com also directs NHAI to speed up the progress, complete Raya Morh to Akhnoor Road stretch at the earliest

KH Correspondent by KH Correspondent
July 8, 2022
in Jammu
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Jammu :Divisional Commissioner, Ramesh Kumar Thursday conducted an extensive tour of the 58 km long Jammu Ring Road Project and inspected the progress of work on various work sites.
He was accompanied by Deputy Commissioner Jammu, AvnyLavasa; Deputy Commissioner Samba, Anuradha Gupta; Project Director NHAI, Yashpal Singh besides concerned Sub Divisional Magistrates, Tehsildars, Engineering Wing of National Highway Authority of India and other officers.
During the tour, the Div Com visited spots like Raya Morh, Sarore, Bishnah, KotliMiran Sahib, Lalayal, Tawi River Bridge site and a few others and inquired about the progress of work. The NHAI officials briefed him about the present status as well as informed about upcoming phase-wise works over the project.
It is pertinent to mention here that the 58 KM, 4-lane Ring Road starts from Raya Morh of Jammu-Pathankot National Highway in Samba district and connects with Jagti on the Jammu Udhampur National Highway. The Phase 1 of the project; from Akhnoor Road to KotBhalwal, has already been opened for traffic.
During the tour, the Div Com interacted with locals at KotliBishnah areas and listened to their issues related to pending land compensation. He was informed that the land acquisition and disbursement of compensation amount has been almost completed. The Div com instructed the concerned SDM, Tehsildar to resolve the bottlenecks if any and expedite the pending disbursement.
It was informed that work on the stretch of 0 to 10 km has been completed which connects Rayamorh to Bishnah, Kunjwani Road via Sarore and local traffic movement is allowed on the road while work on various other stretches are also nearing completion.
While inspecting the progress it was informed that the work on 19 km long Phase 3 is in progress and the road from SardareChak to Akhnoor Road via Sohanjana, Brahmili, WaddiTawi, Ghomanashah, and Marh would be ready by October 2022.
The NHAI officers apprised the Div Com about the progress of work on 12 KM long Phase 4; ChakAbtara to Nikki Tawi via Muralia, Miran Sahib would be substantially completed with 2 lane bridge over Nikki Tawi to be completed by September 2022 while the 4 lane road would be ready by December 2022.
The Div Com also reviewed progress of structures and was informed by the NHAI that out of total 8 major bridges, work on 3 has been completed, besides out of 7 flyovers/ interchanges work on 4 has been completed. It was informed that out of a total 31 minor bridges, work on 27 is completed.
The Div Com directed NHAI officials to expedite the pace of work on Major, Minor bridges, interchanges for their time-bound completion.
The Div Com also inspected the progress of work on the bridge over Tawi River and directed the concerned officers to complete protection work at the earliest.
Responding to the issues related to construction material the Div Com instructed the Mining officers to expedite the permission cases pending for minor mineral blocks to provide adequate construction material to the executing agencies for hassle free execution of work. He also asked them to identify additional minor mineral blocks.
The Divisional Commissioner directed the NHAI to expedite the pace of all the ongoing works and complete the road from Raya Morh to Akhnoor Road at the earliest.
He also directed the concerned officers to ensure proper drainage system, plantation, protection works etc to complete simultaneously.

KH Correspondent

KH Correspondent

Related Posts

TB awareness session conducted at NHIDCL regional office, Jammu

TB awareness session conducted at NHIDCL regional office, Jammu
by K H News Service
June 21, 2026

Jammu :State Tuberculosis Officer Jammu Dr Jyoti Jolly and team, along with District Tuberculosis Officer Jammu Dr Anu Saloch, conducted...

Read moreDetails

DC Kathua holds Public Grievances redressal camp at Mangloor

DC Kathua holds Public Grievances redressal camp at Mangloor
by KH Web Desk
June 3, 2026

Assures time-bound redressal; directs for regular field visits by officers KATHUA, JUNE 03: Deputy Commissioner Kathua Rajesh Sharma today convened...

Read moreDetails

JMC conducts special sanitation drive at Deeli Pond in Ward No. 55

JMC conducts special sanitation drive at Deeli Pond in Ward No. 55
by K H News Service
May 24, 2026

Jammu, :As part of the ongoing CLEAN JAMMU GREEN JAMMU campaign launched by the Jammu Municipal Corporation, a special sanitation...

Read moreDetails

Secretary DLSA Jammu conducts monthly inspection at Prison Legal Aid Clinic -Central Jail Kotbhalwal

Secretary DLSA Jammu conducts monthly inspection at Prison Legal Aid Clinic -Central Jail Kotbhalwal
by K H News Service
May 23, 2026

Jammu : Sub-Judge-Secretary District Legal Services Authority (DLSA) Jammu Maleeka Sharma Friday conducted the monthly inspection of the Prison Legal...

Read moreDetails

ADDC Jammu reviews implementation of PM-SYM Pension Yojana for unorganised workers

ADDC Jammu reviews implementation of PM-SYM Pension Yojana for unorganised workers
by KH Business Desk
May 22, 2026

Jammu :Additional District Development Commissioner (ADDC) Jammu, Sher Singh Thursday chaired a meeting to review the implementation of Pradhan Mantri...

Read moreDetails

JMC launches “Clean Jammu, Green Jammu” Campaign

JMC launches “Clean Jammu, Green Jammu” Campaign
by K H News Service
May 13, 2026

Jammu :The Jammu Municipal Corporation is set to launch a special city-wide campaign aimed at transforming Jammu into a clean,...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire