• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Tuesday, November 3, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

AC approves roll out of Rooftop Solar Scheme in J&K

JAKEDA to install 200 MW Grid Tied Rooftop Solar Power Plants on 50,000 residential buildings in Jammu city

K H News Service by K H News Service
June 12, 2022
in Top News
A A
AC approves installation of roof-top solar power plants, solar water pumps
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar: The Administrative Council (AC), which met here under the chairmanship of Lieutenant Governor, Manoj Sinha, approved the installation of 200 MW of grid-tiled rooftop solar power plants under the “Solar City Mission” in Jammu.
Rajeev Rai Bhatnagar, Advisor to the Lieutenant Governor, Dr. Arun Kumar Mehta, Chief Secretary, J&K and Nitishwar Kumar, Principal Secretary to the Lieutenant Governor attended the meeting.
The decision has been taken to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu and Kashmir to ensure that the electricity needs of the city are fully met from solar energy.
Under the project, 200 MW grid-tiled rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.
The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.
The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy will be provided to the beneficiaries through the DBT mode.
These rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.
With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units.
The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) Targets of 10.5% as fixed by the Government of India.
The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.
A number of additional job roles are also created by solar PV grid-connected projects in secondary and tertiary roles vis-à-vis manufacturing and supply of system equipment such as inverters, cables, trackers, and other parts. As such, around 8000 jobs will be generated through the project.
The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.

K H News Service

K H News Service

Related Posts

CM Omar Inspects Guard of Honour as Darbar Move Offices Reopen in Jammu

CM Omar Inspects Guard of Honour as Darbar Move Offices Reopen in Jammu
by K H News Service
November 3, 2026

Jammu | Nov, 2: Chief Minister Omar Abdullah was on Monday accorded a ceremonial Guard of Honour at the Civil...

Read moreDetails

Centre Committed to Eliminate Terrorism, Make India Drug-Free by 2029: HM Amit Shah

Fuel excise cut brings relief amid global crisis: Amit Shah hails PM Modi’s move
by Agencies
November 3, 2026

HM Challenges Rahul Gandhi to Special Session Discussion Says “No Place for Infiltrators in Electoral Rolls” New Delhi | Nov,...

Read moreDetails

India manages high growth rate amid unprecedented global challenges: PM Modi

PM Modi welcomes US-Iran understanding, hopes it restores stability in West Asia
by Agencies
November 3, 2026

Says "Future of Energy Security Lies in Clean Energy" New Delhi | Nov, 02: Prime Minister Narendra Modi said, it...

Read moreDetails

CM Omar calls for accelerating pace of dev works, effective funds utilization

BJP’s legal notice a ‘love letter’, mark of respect: CM Omar
by K H News Service
November 3, 2026

Ministers directed to review performance of deptts , budget commitments Jammu | Nov,2:Chief Minister Omar Abdullah Monday chaired an introductory...

Read moreDetails

CM inaugurates ₹189 lakh infra works at Civil Sectt Jammu

CM Omar inaugurates two-span truss girder bridge over Nallah Sukhnag
by K H News Service
November 3, 2026

Jammu | Nov, 2: Chief Minister Omar Abdullah today inaugurated infrastructure works worth ₹189 lakh at the Civil Secretariat, Jammu,...

Read moreDetails

Diwali, Chhath Puja demand lifts Kashmir apple trade; premium boxes fetch high rates

Cut in import duty on Washington apples’ evokes demand for roll back of the decision
by Irfan Yattoo
November 3, 2026

Sopore mandi dispatches 3–3.5 lakh boxes daily Traders seek early reopening of Toubal Bridge to ease transportation Sopore|Nov, 2: Demand...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire