• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Monday, July 13, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

AC approves roll out of Rooftop Solar Scheme in J&K

JAKEDA to install 200 MW Grid Tied Rooftop Solar Power Plants on 50,000 residential buildings in Jammu city

K H News Service by K H News Service
June 12, 2022
in Top News
A A
AC approves installation of roof-top solar power plants, solar water pumps
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar: The Administrative Council (AC), which met here under the chairmanship of Lieutenant Governor, Manoj Sinha, approved the installation of 200 MW of grid-tiled rooftop solar power plants under the “Solar City Mission” in Jammu.
Rajeev Rai Bhatnagar, Advisor to the Lieutenant Governor, Dr. Arun Kumar Mehta, Chief Secretary, J&K and Nitishwar Kumar, Principal Secretary to the Lieutenant Governor attended the meeting.
The decision has been taken to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu and Kashmir to ensure that the electricity needs of the city are fully met from solar energy.
Under the project, 200 MW grid-tiled rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.
The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.
The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy will be provided to the beneficiaries through the DBT mode.
These rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.
With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units.
The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) Targets of 10.5% as fixed by the Government of India.
The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.
A number of additional job roles are also created by solar PV grid-connected projects in secondary and tertiary roles vis-à-vis manufacturing and supply of system equipment such as inverters, cables, trackers, and other parts. As such, around 8000 jobs will be generated through the project.
The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.

K H News Service

K H News Service

Related Posts

‘Enough is enough’, says Omar at Jammu’s ‘Delhi Chalo’ rally to press for statehood

CM Omar Abdullah terms Punjab livestock vehicle levy ‘unjust’, seeks Mann’s intervention
by United News of India
July 13, 2026

Jammu, Jul 12 (UNI) Declaring that “enough is enough,” Jammu and Kashmir Chief Minister Omar Abdullah Sunday announced a ‘Delhi...

Read moreDetails

Youth are the builders of our future: LG Sinha

LG Sinha Steers Secure Amarnath Yatra Preparations
by K H News Service
July 13, 2026

Attends Lal Ded Literary Award Function and Launches Book on Lal Ded Do not settle for ordinary achievements. Dream big,...

Read moreDetails

CM desperately trying to rebrand himself as anti-BJP warrior: LoP Sharma

Assembly doesn’t have powers to challenge Art 370 removal: LoP in LA
by K H News Service
July 13, 2026

“Omar Abdullah will be remembered as J&K’s most incompetent CM; people know he wasted two years between marathon tracks and...

Read moreDetails

Dr. Farooq, Omar pay glowing tributes to 13th July 1931 Martyrs 

Dr Farooq, CM Omar greet people on 77th Republic Day
by K H News Service
July 13, 2026

Say NC remains true custodian of legacy of July 13 martyrs, committed to carrying forward their mission of building a...

Read moreDetails

Altaf Bukhari pays tributes to the martyrs of July 13

Altaf Bukhari urges Centre to initiate dialogue, confidence-building measures in J&K
by K H News Service
July 13, 2026

Says, the historic day reminds us of the courage and sacrifices of those who stood up for justice, dignity, and...

Read moreDetails

DC Anantnag visits cloudburst hit areas, takes stock of damage, restoration efforts

DC Anantnag reviews availability of Fuel, LPG in district
by K H News Service
July 13, 2026

Directs early resumption of essential services, assures all possible assistance to affected families ANANTNAG, JULY 12: In order to take...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire