• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Thursday, October 22, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Latest Update

Banihal-Qazigund tunnel likely to be operational in coming weeks

K H News Service by K H News Service
June 6, 2021
in Latest Update
A A
Banihal-Qazigund tunnel likely to be operational in coming weeks

Qazigund-Banihal tunnel

Share on FacebookShare on TwitterWhatsappTelegramEmail

Jammu/ June,6 : The ambitious double-tube Banihal-Qazigund tunnel along the 270-km Jammu-Srinagar  highway built at a cost of Rs 2,100 crore is going through the testing and commissioning process and is likely to become operational in coming weeks, officials of the construction company said on Sunday.
The work on  8.5-km-long tunnel started in June 2011 and, on completion, it would reduce the road distance between Banihal in Jammu and Qazigund in south Kashmir by 16 km. It will bypass Jawahar Tunnel and Shaitan Nalla, which is prone to heavy snowfall and slippery conditions during winters and results in a bottleneck in the strategically important road linking Kashmir to the rest of the country.
A media reported quoted  Chief Manager of Navayuga Engineering Company Muneeb Tak as saying “we are presently engaged in the testing commissioning process after the installation of all required equipment including ventilation and electric system.” He said they are working round-the-clock and the “people will get the good news soon”. The official said the tunnel is trafficable at the moment and is going through the final stages before it is dedicated to the people of Jammu & Kashmir. Navayuga sources said the ongoing work is expected to be completed within a few weeks and the tunnel is most likely to be thrown open to traffic by the end of this month.
They said the company had also received a nod for the trial run of the traffic through the tunnel.
Tak said the tunnel is a masterpiece of engineering and has been constructed with the Austrian Tunneling Method.
“The tunnel has been built on the Build Operate and Transfer base system with a state-of-the-art exhaust system to remove gas and bring in the fresh air,” he said. He said 126 Jet fans, 234 CCTV modern cameras and a firefighting system have been installed in both tubes of the tunnel.
“A corridor between two tubes after every 500 meters inside the tunnel has been built and this can be used in case of any emergency in either tube,” the official said. The existing road tunnel below the Banihal pass often witnessed traffic congestion that affected movement on the highway, the only all-weather road linking Kashmir with the rest of the country, due to its elevation of 2,194 m (7,198 ft) and limited traffic capacity.
The new tunnel”s average elevation at 1,790 m (5,870 ft) is 400 m lower than the existing Jawahar tunnel”s elevation, which would make it less prone to avalanches and fulfills the dream of expressway between Srinagar and Banihal.
The work on the tunnel was delayed for several reasons in the past 10 years including unexpected land condition inside the tunnel as well as issues related to local landlords and company workers. Company insiders, however, attributed the difficult geographical terrain and inclement weather conditions during winters as the primary reasons for the delay in the completion of the mega project.

K H News Service

K H News Service

Related Posts

JKBOSE withdraws 20% Minimum marks rule for re-evaluation

JKBOSE notifies dates for re-evaluation, photocopies of answer scripts
by KH Web Desk
October 21, 2026

Srinagar, Oct 21: JKBOSE has removed the 20 percent minimum marks condition for re-evaluation. Candidates of Classes 10, 11, and...

Read moreDetails

The valour of our martyrs inspires us to strengthen peace, unity, and security: LG Sinha

LG Sinha invites suggestions for SMVDSB’s upcoming ‘International Goddess Museum’ at Katra
by KH Web Desk
October 21, 2026

Lieutenant Governor Pays Tribute to Martyred Police Personnel on Police Commemoration Day SRINAGAR, OCTOBER 21: The Lieutenant Governor, Manoj Sinha...

Read moreDetails

Iltija Mufti Backs Forestry Students, Calls for Review of Forester Recruitment Rules

Iltija Mufti Backs Forestry Students, Calls for Review of Forester Recruitment Rules
by KH Web Desk
October 21, 2026

Ganderbal, Oct 21: Peoples Democratic Party (PDP) leader Iltija Mufti on Wednesday visited the Faculty of Forestry at Sher-e-Kashmir University...

Read moreDetails

J&K Government Hikes Monthly Stipend for MBBS, BDS Interns to Rs 25,000

J&K Government Hikes Monthly Stipend for MBBS, BDS Interns to Rs 25,000
by KH Web Desk
October 21, 2026

Srinagar, October 21: The Jammu and Kashmir Government has enhanced the monthly stipend for MBBS and BDS interns, including Foreign...

Read moreDetails

3 Black Bears Captured In Andoo Nowgam, 6 In 20 Days In Anantnag: Wildlife Deptt

3 Black Bears Captured In Andoo Nowgam, 6 In 20 Days In Anantnag: Wildlife Deptt
by KH Web Desk
October 21, 2026

Anantnag, Oct 21: Wildlife Control Room Achabal captured a black bear in Andoo Nowgam area of Anantnag district on Wednesday....

Read moreDetails

Your days are numbered, DGP Nalin Prabhat warns terror supporters

Your days are numbered, DGP Nalin Prabhat warns terror supporters
by KH Web Desk
October 21, 2026

Vows to uproot terrorism and its support network; calls for communal harmony, drug-free J&K Srinagar, Oct 21: Jammu and Kashmir...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW