• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Wednesday, November 11, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

LG e-inaugurates 17 Power Projects

K H News Service by K H News Service
April 4, 2021
in Top News
A A
LG visits Purmandal – Utterbehani and Mansar-Surinsar twin lakes, directs speedy dev
Share on FacebookShare on TwitterWhatsappTelegramEmail

Baramulla: In a major push to strengthen the power infrastructure in Jammu & Kashmir, Lieutenant Governor, Manoj Sinha Saturday e-inaugurated 17 Power Projects worth Rs. 118.91 Crore at Delina, Baramulla.
Speaking on the occasion, the Lt Governor observed that the inauguration of new projects is another step towards developing better Power Distribution and efficient Power Transmission system in the region.
To realize the vision of making J&K Power surplus, Rs 54,000 Crore worth power projects have been approved which would generate 3500 Megawatt in three to four years, the Lt Governor observed.
The Lt Governor underscored that determined efforts are being made to reach out to all the unconnected habitations, besides providing 24×7 quality electricity to the people of J&K.
He added that the Government is taking many short terms, medium term, and long term measures to provide the people with quality power supply round the clock in the coming two years.
Power sector now has an increased Budget of Rs 120 Cr, taking the total to Rs 2728 cr. New projects are being completed and added to the existing grid. Several bottlenecks causing delays in the timely completion of augmentation and restoration works of various power projects and creating power crisis in the winter season are being identified and subsequently eliminated, the Lt Governor maintained.
Responsibilities are being fixed and experts from power sector were roped in to provide vital inputs for mitigation of power related issues, he added.
Addressing the welfare issues of the field functionaries, the Lt Governor said that social security is being provided to the field functionaries of PDD who are prone to vulnerability.
Meanwhile, Baseer Ahmad Khan, Advisor to Lt Governor gave a brief scenario of the power sector and highlighted the measures taken by the department to augment the power infrastructure in Jammu & Kashmir.
Rohit Kansal, Principal Secretary, Power Development Department and Information Department; Bhupinder Kumar, Deputy Commissioner Baramulla; Chief Engineers; senior officers and other concerned functionaries were present on the occasion.
The projects which were e-inaugurated Saturday are augmentation of Delina 220 KV Grid station from 160 MVA to 320 MVA; Commissioning of Double circuit 220 KV interconnection between New Wanpoh Grid station and Mir Bazaar grid station; Construction of 33/11kV 10 MVA Sub Station at Tral Bala; Construction of 33/11kV 6.3 MVA Sub Station at Chowgam; Construction of 33/11kV 10 MVA Sub Station at Soibugh; Construction of 33/11kV 10 MVA Sub Station at Verinag; Construction of 33/11kV 6.3 MVA Sub Station at Nagam (DH Pora); Construction of 33/11kV 10 MVA Sub Station at Aglar; Augmentation of Foodpark Sub Station from 1×6.3 MVA to 2×6.3 MVA; Augmentation of BK Pora Sub Station from 2×6.3 MVA to 2X10+6.3 MVA; Augmentation of Khan sahib Sub Station from 6.3+ 5 MVA to 10+5 MVA; Augmentation of Awantipora Sub Station from 2×10 MVA to 3X 10 MVA; Sub-Transmission and Distribution Works in 6 Towns (Budgam, Khansahib, Chadoora, Magam, Beerwah, and Char-i-Sharief ) in Budgam Circle; Distribution Works in Anantnag Town; Distribution Works in Dooru Town; Distribution Works in Kulgam Town; Distribution Works in Handwara Town.

 

K H News Service

K H News Service

Related Posts

CM Omar Reviews SASCI Progress, Sets Tight Deadlines for Completion

CM Omar Reviews SASCI Progress, Sets Tight Deadlines for Completion
by K H News Service
November 11, 2026

Omar asks Officrs to strive for maxi allocation under incentive based components Jammu| Nov, 10:Chief Minister Omar Abdullah Tuesday chaired...

Read moreDetails

KPDCL launches Digital Handbook on Winter Preparedness 2026–27

KPDCL launches Digital Handbook on Winter Preparedness 2026–27
by K H News Service
November 11, 2026

Comprehensive winter action plan covering network readiness, swift restoration, grievance redressal and consumer safety Srinagar | Nov, 10:In view of...

Read moreDetails

J&K Braces for Rain, Heavy Snowfall Likely In Next 3 Days

Heavy Rain Lashes J&K, Gulmarg Records 55mm, Kathua Tops With 153.4mm
by K H News Service
November 11, 2026

Temperature May Drop By 6–8°C , Travel Advisories Issued Srinagar | Nov, 10:Jammu and Kashmir is likely to witness widespread...

Read moreDetails

National Conference Begins Forming Ministerial Advisory Groups

NC Intact, Opposition Spreading Rumors: Sakeena Itoo
by K H News Service
November 11, 2026

Party Legislators Asked to Submit Preferences Within Two Weeks Srinagar | Nov, 10: In a strategic move to address discontent...

Read moreDetails

NC Intact, Opposition Spreading Rumors: Sakeena Itoo

Remove AFSPA from J&K: Minister Sakina Itoo
by K H News Service
November 11, 2026

Gulmarg | Nov, 10: Health Minister Sakeena Itoo dismissed reports of internal rifts within the ruling National Conference on Tuesday,...

Read moreDetails

Delina Flyover Nears Completion, Targets May 2027 Opening

Guv dedicates second phase of Jehangir Chowk-Rambagh flyover to commuters
by K H News Service
November 11, 2026

Key Bottlenecks Cleared,Land Compensation Payments Processed Baramulla | November 10: The 1.7-kilometer Delina Flyover, constructed as a critical component of...

Read moreDetails
Srinagar WEATHER

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW