• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Tuesday, October 6, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Business

Jitendra reviews progress on Devika Project at Udhampur

KH Business Desk by KH Business Desk
January 31, 2021
in Business
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Udhampur: Union Minister of State (Independent Charge) for the Ministry of Development of North Eastern Region and Minister of State for Prime Minister’s Office, Personnel, Public Grievances and Pensions, Department of Atomic Energy and Department of Space, Dr Jitendra Singh, Saturday visited District Udhampur to assess the latest progress of ongoing developmental works of Pollution abatement of river Devika and Tawi project under National River Conservation Plan (NRCP).
The meeting was attended by Principal Secretary to the Government, Housing and Urban Development Department, Dheeraj Gupta; District Development Commissioner, Udhampur Dr. Piyush Singla; Chief Engineer UEED, Basharat Khawosa; Additional District Development Commissioner, Ashok Kumar; President Municipal Council, Udhampur Dr Jogeshwar Gupta; Assistant Commissioner Revenue, Viqar Giri; SE UEED, Rakesh Gupta; Executive Engineers, UEED, R&B, PHE besides all departments and contractors involved in the execution of the project .
Dr Singh visited the Devika Ghat to inspect the progress of ongoing developmental works of prestigious project.
Chief Engineer UEED, Jammu Basharat Khawosa gave a detailed Power Point presentation about the latest progress. He informed that an amount of Rs. 186.72 crore has been sanctioned for this prestigious project and the construction works are divided into three zones. He informed that 40 % ongoing works of Ghats have been competed so far. He added that the work on three Chhatris is in progress including the beautification works, while construction of structures and retaining wall has been completed so far. He further apprised the Union Minister that 80% beautification works of Shiva statue has been completed.
While reviewing the work wise progress of Devika projects in a meeting, Dr Jitendra directed the Chief Engineer to complete the ongoing work of package -1 of this prestigious project before April 13 , 2021 and also directed to ensure the shifting of HT/LT line from the project site. Contractors were directed to expedite the works of STP.
Threadbare discussions were held on various issues faced by the contractors. The Chief Engineer was asked to set component wise timeline for completion of project.
Dr. Singh asked the executing agencies to ensure quality standards and also advised to appoint third party for monitoring of quality of material. He stressed on the use the material dually vetted by the technical Committee to ensure that only standard material is used.
The Executing agencies were also asked to restore excavated areas immediately after execution of work and permanent restoration of roads where pipes have been laid down.
The Chief Engineer UEED was asked to set up institutional mechanism for restoration of sites where sewage pipe is laid. Dr Singh emphasized for advance planning for men, machinery and material and asked to ensure sufficient material is available on the onsite store.
Dr Singh stressed on inter departmental coordination for execution of their respective plans for saving of resources and causing minimum disruption in movement of public. He asked all the departments to work jointly to resolve bottlenecks, if any.
The MoS appreciated the efforts of DDC Udhampur, Dr Piyush Singla for monitoring the project closely and taking regular review meetings for smooth execution of this project. He stressed on activation of more men and machinery for completion of the project within a set time frame.
During the visit, DDC apprised the MoS about the Devika theme park project which will be completed by the end of this financial year.
Later, Dr Singh distributed golden cards among beneficiaries registered under PMJAY and PMJAY Sehat scheme.

KH Business Desk

KH Business Desk

Related Posts

DC Bandipora reviews progress of District Capex Budget 2026-27

DC Bandipora reviews progress of District Capex Budget 2026-27
by KH Business Desk
October 6, 2026

Chib directs Time-Bound execution of Works   Bandipora : Deputy Commissioner (DC) Bandipora, Indu Kanwal Chib, on Monday chaired a...

Read moreDetails

MSME Ministry Field office Srinagar organises MDP on Business Marketing

MSME Ministry Field office Srinagar organises MDP on Business Marketing
by KH Business Desk
October 6, 2026

Anantnag : The Branch MSME Development & Facilitation Office (MSME-DFO), Srinagar, in collaboration with the District Industries Centre (DIC), Anantnag,...

Read moreDetails

DAHJ reviews progress of Animal Husbandry sector programmes

DAHJ reviews progress of Animal Husbandry sector programmes
by KH Business Desk
October 6, 2026

Jammu : Director Animal Husbandry Department Jammu Dr. Jugal Kishor Monday convened a review meeting here in the Meeting Hall...

Read moreDetails

DC Udhampur reviews progress of District plan, RDD works

DC Udhampur reviews progress of District plan, RDD works
by KH Business Desk
October 6, 2026

Udhampur : Deputy Commissioner Udhampur Minga Sherpa Monday chaired a meeting to review the progress of works under the District...

Read moreDetails

DC Bandipora reviews Road Safety Measures, seeks Time-Bound ATRs

DC Bandipora reviews Road Safety Measures, seeks Time-Bound ATRs
by KH Business Desk
October 4, 2026

Bandipora : Deputy Commissioner Bandipora, Indu Kanwal Chib, on Saturday chaired a meeting of the District Road Safety Committee (DRSC)...

Read moreDetails

Asian Paints Launches Hydronaa, Ultraa Wood Adhesives With 384-Sq-Ft Wooden Mosaic

Asian Paints Launches Hydronaa, Ultraa Wood Adhesives With 384-Sq-Ft Wooden Mosaic
by KH Business Desk
October 4, 2026

Srinagar |: Asian Paints Wood Adhesives has launched two new products, Hydronaa and Ultraa, as part of its expansion of...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire