• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Saturday, September 12, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Business

Jitendra reviews progress on Devika Project at Udhampur

KH Business Desk by KH Business Desk
January 31, 2021
in Business
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Udhampur: Union Minister of State (Independent Charge) for the Ministry of Development of North Eastern Region and Minister of State for Prime Minister’s Office, Personnel, Public Grievances and Pensions, Department of Atomic Energy and Department of Space, Dr Jitendra Singh, Saturday visited District Udhampur to assess the latest progress of ongoing developmental works of Pollution abatement of river Devika and Tawi project under National River Conservation Plan (NRCP).
The meeting was attended by Principal Secretary to the Government, Housing and Urban Development Department, Dheeraj Gupta; District Development Commissioner, Udhampur Dr. Piyush Singla; Chief Engineer UEED, Basharat Khawosa; Additional District Development Commissioner, Ashok Kumar; President Municipal Council, Udhampur Dr Jogeshwar Gupta; Assistant Commissioner Revenue, Viqar Giri; SE UEED, Rakesh Gupta; Executive Engineers, UEED, R&B, PHE besides all departments and contractors involved in the execution of the project .
Dr Singh visited the Devika Ghat to inspect the progress of ongoing developmental works of prestigious project.
Chief Engineer UEED, Jammu Basharat Khawosa gave a detailed Power Point presentation about the latest progress. He informed that an amount of Rs. 186.72 crore has been sanctioned for this prestigious project and the construction works are divided into three zones. He informed that 40 % ongoing works of Ghats have been competed so far. He added that the work on three Chhatris is in progress including the beautification works, while construction of structures and retaining wall has been completed so far. He further apprised the Union Minister that 80% beautification works of Shiva statue has been completed.
While reviewing the work wise progress of Devika projects in a meeting, Dr Jitendra directed the Chief Engineer to complete the ongoing work of package -1 of this prestigious project before April 13 , 2021 and also directed to ensure the shifting of HT/LT line from the project site. Contractors were directed to expedite the works of STP.
Threadbare discussions were held on various issues faced by the contractors. The Chief Engineer was asked to set component wise timeline for completion of project.
Dr. Singh asked the executing agencies to ensure quality standards and also advised to appoint third party for monitoring of quality of material. He stressed on the use the material dually vetted by the technical Committee to ensure that only standard material is used.
The Executing agencies were also asked to restore excavated areas immediately after execution of work and permanent restoration of roads where pipes have been laid down.
The Chief Engineer UEED was asked to set up institutional mechanism for restoration of sites where sewage pipe is laid. Dr Singh emphasized for advance planning for men, machinery and material and asked to ensure sufficient material is available on the onsite store.
Dr Singh stressed on inter departmental coordination for execution of their respective plans for saving of resources and causing minimum disruption in movement of public. He asked all the departments to work jointly to resolve bottlenecks, if any.
The MoS appreciated the efforts of DDC Udhampur, Dr Piyush Singla for monitoring the project closely and taking regular review meetings for smooth execution of this project. He stressed on activation of more men and machinery for completion of the project within a set time frame.
During the visit, DDC apprised the MoS about the Devika theme park project which will be completed by the end of this financial year.
Later, Dr Singh distributed golden cards among beneficiaries registered under PMJAY and PMJAY Sehat scheme.

KH Business Desk

KH Business Desk

Related Posts

DC B’pora Visits Kaloosa to Monitor Search Operation for Drowned Boy

DC B’pora Visits Kaloosa to Monitor Search Operation for Drowned Boy
by K H News Service
September 12, 2026

Chib Asks Parents To Keep Children Away From Water Bodies    Bandipora : Deputy Commissioner (DC) Bandipora, Indu Kanwal Chib,...

Read moreDetails

Dy CM inaugurates Kashmir Expo 2026 at Zabarwan Park

Dy CM inaugurates Kashmir Expo 2026 at Zabarwan Park
by KH Business Desk
September 12, 2026

3 day showcase celebrates J&K’s craft, culture, cuisine, entrepreneurial talent   Srinagar : Jammu and Kashmir Trade Promotion Organization (JKTPO)...

Read moreDetails

J&K Bank secures ‘Best Bank Award’ for Digital Transformation  

J&K Bank secures ‘Best Bank Award’ for Digital Transformation  
by KH Business Desk
September 12, 2026

Srinagar :  J&K Bank has won the Best Bank Award for Digital Transformation in Banking at the Navabharat BFSI Summit...

Read moreDetails

Bharti Airtel Foundation, Army Goodwill Schools Celebrate a Decade of partnership 

Bharti Airtel Foundation, Army Goodwill Schools Celebrate a Decade of partnership 
by KH Business Desk
September 12, 2026

Srinagar  : Bharti Airtel Foundation and HQ Northern Command's Army Goodwill Schools (AGS) on Friday  celebrated 10 years of partnership...

Read moreDetails

MD  JPDCL flags off vehicles carrying safety equipment for field staff of JPDCL

MD  JPDCL flags off vehicles carrying safety equipment for field staff of JPDCL
by KH Business Desk
September 12, 2026

Jammu : In a significant step towards strengthening safety measures for field personnel, the Managing Director, Jammu Power Distribution Corporation...

Read moreDetails

ADDC Budgam reviews progress under PM Surya GharMuft Bijli Yojana, RDSS

ADDC Budgam reviews progress under PM Surya GharMuft Bijli Yojana, RDSS
by KH Business Desk
September 12, 2026

Budgam : Additional District Development Commissioner (ADDC) Budgam, Vivek Agarwal, Friday chaired a review meeting to assess the progress of...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW