• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Saturday, October 10, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

Vulnerable locations an impediment in 4-laning of Kashmir highway, ‘Bailey bridge will be ready by today: NHAI

K H News Service by K H News Service
January 15, 2021
in Top News
A A
Vulnerable locations an impediment in 4-laning of Kashmir highway, ‘Bailey bridge will be ready by today: NHAI
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar: Owing to the ‘vulnerable locations’ along the way, the work on four laning of Srinagar Jammu Highway has been halted at many places.
Srinagar Jammu highway, a vital surface link between Kashmir valley and rest of India, gets frequently closed in winters due to heavy snowfall, landslides and shooting stones, which results in the delay of essential supplies and other commodities to the valley.
The closure also leads to the stranding of several thousand passengers and vehicles on both sides of the Highway. The frequent closure of the road causes not just death, but also countless misery and pain on the people of the Kashmir valley.
For the past 70 years, successive governments have failed to find alternatives to the crises.
To curb the road connectivity crises Government of India approved the implementation of projects for four-laning of the mountainous Highway in the year 2011, the only road link to the Kashmir Valley which is extremely vulnerable to inclement weather.
The four-laning project was divided into six sub-projects, comprising widening of the Jammu-Udhampur road (65 km), Chenani-Nashri tunnel (9.2 km), widening of Ramban-Udhampur road (43 km), Banihal-Ramban road (36 km), Qazigund-Banihal road (15.25 km) and Srinagar-Banihal road (67.7 km).
However, in the past 10 years, the road widening project has failed to complete, missing several deadlines.
National Highway Authorities confirmed that work on four laning of the Highway has been stopped at many places and no excavation is taking place at the vulnerable areas.
“We have stopped the excavation work in many places, as soon as we start the work the portion of land sunken. We are exploring the options of tunnels and wide- ups, the process is under the study,” an official of NHAI said.
The Pir Panjal range, being a plateau, is a geo-morphologically different from the rest of the district ranges. This geomorphic unit, together with a tropical climate, allows for the formation of a thick column of soil.
Vibrations from heavy equipment along with natural factors decrease the strength of the hills, resulting in them becoming more prone to landslides.
Over the past few years with the increase in construction and widening of the highway and tunnels, incidents of landslides have increased.
“At some places the excavation work has been stopped, as the location are vulnerable for digging we are planning to built tunnels at these places which will make traffic to ply in all weather conditions. Rest of the work will be completed by mid of 2022,” Project Director NHAI in Kashmir Purshotam Kumar said. “As far as the Bailey bridge is concerned we are expecting it will be completed by tomorrow”, he said.
Meanwhile, the alternative route ‘Mughal Road’ continues to be closed because of heavy snowfall in the region

 

 

K H News Service

K H News Service

Related Posts

’J&K can emerge as a competitive destination for GCC Companies’, says CM Omar Abdullah

Council of Ministers approves ₹93 crore power infrastructure projects for Srinagar
by K H News Service
October 10, 2026

CM addresses inaugural session of J&K GCC Summit 2026 at IIM Jammu Invites industry to explore opportunities in J&K; assures...

Read moreDetails

J&K Govt shuffles Police Brass, 100 officers transferred

17 top IPS officers among 74 Transferred in upper, middle rungs of J&K Police Admin
by K H News Service
October 10, 2026

Danesh Rana gets Police Housing Corp, Garib Dass named ADG Homeguards; Srinagar Traffic and National Highway Traffic get new chiefs;...

Read moreDetails

Thousands attend annual urs of Sheikh-ul-Aalam at Charar-i-Sharief; devotees arrive from across country

Prayers to seek rainfall to end the drought season in Kashmir valley
by K H News Service
October 10, 2026

Budgam, Oct 09 (KNO): Nearly 50,000 devotees from different parts of Jammu and Kashmir and other parts of the country...

Read moreDetails

LG, CM expresses grief over Rajouri road accident

60-Year-Old Dies After being hit In Uri Road Mishap
by K H News Service
October 10, 2026

Directs district admin to expedite rescue operations, ensure best possible treatment to injured NEW DELHI, OCTOBER 9: Chief Minister Omar...

Read moreDetails

J&K likely to witness rain, snow on October 10, 13-14, predicts MeT

Heavy Rain Lashes J&K, Gulmarg Records 55mm, Kathua Tops With 153.4mm
by K H News Service
October 10, 2026

Srinagar: The Meteorological Centre Srinagar on Friday predicted that higher reaches of Jammu and Kashmir are likely to witness light...

Read moreDetails

Advisor Nasir Aslam highlights Kashmir Marathon, winter experiences at TTF Hyderabad 2026

Govt appoints Nasir Aslam Wani as advisor to CM Omar
by K H News Service
October 10, 2026

Invites tourists from southern India, runners nationwide to explore Kashmir HYDERABAD, OCTOBER 9: Advisor to the Chief Minister, Nasir Aslam...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire