Jammu: In order to carry out the work of branch cutting alongwith HT/LT network, the power supply to Upper Bathindi and its adjoining areas fed from B-4 feeder shall remain affected on June 20 from 06 am to 10 pm.
Jammu: In order to carry out the work of branch cutting alongwith HT/LT network, the power supply to Upper Bathindi and its adjoining areas fed from B-4 feeder shall remain affected on June 20 from 06 am to 10 pm.
The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.
MORE