Srinagar: According to Chief Engineer, EM&RE wing, Kashmir, the 33 KV Habak-Ganderbal line will remain shutdown on 5th , 7th, and 9th January 2019 from 10 am to 2.30 pm to carry out necessary stabilization and branch cutting program.
Srinagar: According to Chief Engineer, EM&RE wing, Kashmir, the 33 KV Habak-Ganderbal line will remain shutdown on 5th , 7th, and 9th January 2019 from 10 am to 2.30 pm to carry out necessary stabilization and branch cutting program.
The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.
MORE