Jammu: As per Superintending Engineer, Elect. Maintt& R.E. Circle-1 Jammu, to carry out the works of temporary shifting of HT/LT network coming in the alignment of 4-laning of Jammu Akhnoor National Highway, the shutdown of 11KV feeders T-3, T-4, & SN-4 is being observed.
During the shutdown, the power supply to Bharat Nagar, Vasant Vihar, Kabir Colony, Poonch House, Talab Tillo, Kamla Palace, Mandlik Nagar, PattaPaloura, Top Paloura, Shanti Nagar and its adjoining areas will remain affected on January 02 from 8 am to 2 pm.
Meanwhile, for shifting /re-alignment of 33 KV PC-4 Line (Bohri-Udheywalla and Machillian section) emanating from 132/33 KV Grid Station Pounichak, the power supply to Lalla-da-Bagh, Lower Muthi, Lakshmi Vihar, BalwantVihar, Udheywala, Anand Nagar, Machillian, Nagbani and adjoining areas will remain affected on January 02 from 11 am to 4 pm.
Div Com Jammu inspects ongoing works under Jammu Ring Road Project
Jammu | Nov, 07:Divisional Commissioner Jammu, Vikas Kundal Saturday conducted an extensive inspection of the ongoing works under the Jammu...
Read moreDetails


