Jammu/Nov, 9: As per Executive Engineer, 400 KV TLD (BHEP), Chanderkote, the shutdown of 400 KV D/C Baglihar-Kishanpur Circuit-I line is observed on November 12, 13 and 14 from 08 am to 05 pm.
Similarly, the shutdown of 400 KV D/C Baglihar-Kishanpur Circuit-II line is observed on November 15, 16 and 17 from 08 am to 05 pm.