• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Monday, August 3, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Business

Sunil, Dy Speaker review power scenario in Gurez

K H News Service by K H News Service
May 17, 2018
in Business
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar: Minister for Power Development Sunil Kumar Sharma along with Deputy Speaker Legislative Assembly, Nazir Ahmad Khan Gurezi Thursday convened a meeting to take stock of functioning and progress on various developmental activities being carried out by the Power Development Department in Gurez sub-division.

Commissioner Secretary PDD Hridesh Kumar, Development Commissioner PDD Asgar Ali Majaz, Chief Engineer M&RE Shahnaz Goni, Chief Engineer Projects PDD Daljeet Singh, Chief Engineer PDC Fayaz Andrabi, Chief Engineer S&O Muzaffar Ahmad, Director P&S Rakesh Jamwal and other concerned were present in the meeting.

On the occasion, the Deputy Speaker, who is also MLA from Gurez constituency, raised issues related to power scenario in Gurez and about the pace of work on transmission line connecting Bandipora to Gurez and Gurez to Tulail under different schemes including DDUGJY.

The meeting was informed that the phase one of the project— 66km long Bandipora to Gurez line has been approved while Gurez to Tulail line is under the process of approval.

The meeting was informed that the necessary approval for the phase second of the project will be sought shortly and work on the project will be started immediately and completed on a war footing.

Gurezi asked the officers to ensure that the power lines are laid underground at Razdan portion to prevent electricity breakdown during winters so that the people of these remote areas don’t face inconvenience in this regard.

The Deputy Speaker also sought the progress of setting up of Receiving Station in Gurez for which tentative dates for laying foundation stone was proposed as May 25. He also sought an electric special sub-division in Gurez for which framing of a proposal was sought from the concerned authorities besides posting of Assistant Engineer to Gurez.

He enquired the status of work on 17 MW Markoot Power Project and was informed that Pre-Feasibility Report (PFR) for the project was already envisaged and that the work on it will be started soon.

He also sought better facilities to the people of the sub-division during the holy month of Ramadan.

 

K H News Service

K H News Service

Related Posts

VC SKUAST-K chairs 14th Scientific Advisory Committee Meeting of KVK Shopian

VC SKUAST-K chairs 14th Scientific Advisory Committee Meeting of KVK Shopian
by KH Business Desk
August 2, 2026

Ganai also chairs 20th Scientific Advisory Committee Meeting of KVK Kulgam   Shopian : The 14th Scientific Advisory Committee (SAC)...

Read moreDetails

FDA issues Public Health Advisory against Unsafe “New Fast Tea”

FDA issues Public Health Advisory against Unsafe “New Fast Tea”
by KH Business Desk
August 2, 2026

Sale and Distribution of Affected Batch Prohibited   Srinagar : The Food & Drugs Administration (FDA), Jammu & Kashmir, has...

Read moreDetails

SKUAST-K to set up J&K’s first 50-kW Agrivoltaics Research Pilot at Shalimar Campus

SKUAST-K to set up J&K’s first 50-kW Agrivoltaics Research Pilot at Shalimar Campus
by KH Business Desk
August 2, 2026

Srinagar : In a major step towards integrating clean energy with agriculture, Sher-e-Kashmir University of Agricultural Sciences and Technology of...

Read moreDetails

Compensation of over Rs 30 lakh disbursed to Labours in Kupwara under Employees’ Compensation Act

Compensation of over Rs 30 lakh disbursed to Labours in Kupwara under Employees’ Compensation Act
by KH Business Desk
August 2, 2026

Kupwara : Deputy Commissioner, Kupwara, Shrikant Suse Saturday disbursed labour compensation to applicants in two separate cases under Section 4...

Read moreDetails

Drug peddler held in Anantnag: Police

Drug peddler held in Anantnag: Police
by K H News Service
August 1, 2026

Bandipora : Police on Saturday said that it has arrested a drug peddler during naka checking at Pazalpora Bijbehara. In...

Read moreDetails

Labour Commr reviews progress of PM-SYM Scheme, Labour Codes implementation at Ganderbal

Labour Commr reviews progress of PM-SYM Scheme, Labour Codes implementation at Ganderbal
by K H News Service
August 1, 2026

Ganderbal : A comprehensive review meeting on the implementation of the Pradhan Mantri Shram Yogi Maandhan (PM-SYM) Scheme and the...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire