• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Sunday, August 23, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Business

DC Poonch reviews progress on laying of 132 KV Transmission line

KH Business Desk by KH Business Desk
May 8, 2018
in Business
A A
Share on FacebookShare on TwitterWhatsappTelegramEmail

Poonch: District Development Commissioner Poonch  Mohammad Aijaz Asad Tuesday chaired a meeting to review progress on laying of 132 KV transmission line from Draba to Chandak.

The estimated cost of the Project is Rs 29 crore involving construction of more than 100 Transmission Towers. The Project is being executed by PGCIL.

The meeting was attended by Superintending Engineer Project Wing, Xen Systems and Operations, Chief Planning Officer, Executive Engineer EM &RE Poonch, Chief Project Manager PGCIL Jammu, Executive Engineer System and operations Jammu, Executive Engineer Project wing PDD Jammu  along  with contractor R-APDRP and other officers.

After threadbare discussion, it was informed in the meeting that 132 KV project is targeted to be completed within 16 months. “The ongoing survey shall be completed by mid-June, while the actual execution shall start from July 2018” the meeting was told.

The DC issued directions to the concerned agency for bye passing the residential areas from HT transmission lines to avoid any displacement of the populace. He reiterated that project execution work must meet the set deadline.

Deputy Manger IRCON also apprised the meeting about status of R-APDRP works in Poonch Town.

The DDC stressed on the installation of six transformers and 2.5km Aerial Bunch cable (ABC) in the city as per DPR and  said no item/quantity shall be allowed to be shifted to outside District within same cluster.

While underlining the importance of 132 KV Transmission Line, the DC said the project after completion shall establish a robust power supply mechanism in Poonch District. He told the state authorities to take periodical review of the pace of progress on the project to ensure its early completion.

KH Business Desk

KH Business Desk

Related Posts

Javed Rana reviews implementation of PM  Van Dhan Vikas Yojana in J&K

Javed Rana reviews implementation of PM  Van Dhan Vikas Yojana in J&K
by KH Business Desk
August 23, 2026

Minister Directs formation of more SHGs, enhanced financial, physical progress Jammu :Minister for Jal Shakti, Forest, Ecology & Environment and...

Read moreDetails

GI QR labelling begins at Quality Control Lab of Handicrafts Dept

GI QR labelling begins at Quality Control Lab of Handicrafts Dept
by KH Business Desk
August 23, 2026

Lab shall certify non-textile & languishing crafts to add brand value and improve market reach Srinagar : In a significant...

Read moreDetails

DC Kathua Reviews HADP, JKCIP Progress

DC Kathua Reviews HADP, JKCIP Progress
by KH Business Desk
August 23, 2026

Kathua : Deputy Commissioner Rajesh Sharma Saturday reviewed the implementation and progress of the Holistic Agriculture Development Plan (HADP) and...

Read moreDetails

JKEDI Holds Entrepreneurship Orientation for Qalamabad Students

JKEDI Holds Entrepreneurship Orientation for Qalamabad Students
by KH Business Desk
August 23, 2026

Srinagar : The Jammu & Kashmir Entrepreneurship Development Institute (JKEDI) organised an Entrepreneurship Orientation Programme for students of Boys Higher...

Read moreDetails

Jal Shakti clarifies water meter installation in Kathua

Jal Shakti clarifies water meter installation in Kathua
by KH Business Desk
August 23, 2026

Metering limited to registered commercial and industrial consumers; no proposal for domestic connections   Kathua : Amid reports in print...

Read moreDetails

Javid Dar flags off 250 farmers for training at CITH

Javid Dar flags off 250 farmers for training at CITH
by KH Business Desk
August 21, 2026

Srinagar : Minister for Agriculture Production, Rural Development and Panchayati Raj, Cooperatives and Election Department, Javid Ahmad Dar, today flagged...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire