Jammu: As per Chief Engineer Elect, Maintt& R.E Wing, Jammu, the shutdown of 11 KV Feeder BB-23 emanating from 2×10 MVA 33/11 KV BB-II is being observed.
During the shutdown, the power supply to Industry Bari Brahmana shall remain affected on March 18 from 10 am to 5 pm.