Power shutdown in Jmu parts

Power shutdown in Jmu parts

Jammu: As per Chief Engineer, Elect. Maintt. & R.E. Wing, Jammu, due to theMockstart Operation to be conducted by the NRLDC from 10.30AM to 1.30 PM on 2.11.2018, at Grid Station Barn, power of the area falling under 132/33KV Grid Stations -Canal, Pounichak, Barn, Rajouri, &Katra shall remain disturb during the operation.

Leave a Reply

Your email address will not be published. Required fields are marked *

Widgetized Section

Go to Admin » appearance » Widgets » and move a widget into Advertise Widget Zone