• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Tuesday, September 22, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Business

Power Shutdown in Central Kashmir parts

KH Business Desk by KH Business Desk
August 5, 2025
in Business
A A
Power shutdown in Rajbagh Srinagar
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar  | :  According to the Chief Engineer, Distribution, KPDCL, in order to carry out the work of erection of 11 mtr long ST Poles and shifting of conductor of 33 KV Khansahib Tap line at site Bugroo village, shutdown of 33KV Khansahib line shall be observed due to which 33/11KV Receiving Stations at Khansahib, Raithan, Brenwar shall remain off while power supply to Brenwar, Surasyar, Shenipora, Khansahib, Raithan, Yarikhah, Gurwaite, essential, raithan, Watred and adjoining areas will be affected from 06:00 AM to 01:00 PM on 06 August, 2025.

Also to facilitate works related to construction (widening/ strengthening) of 02 lane, shutdown of 33 KV Amargarh SIDCO line shall be observed due to which 33/11KV Receiving Stations at Rohama, Chakloo, MID, Irrigation Seer shall remain off while power supply to Ladoora, Chakloo, Tragpora, Shutloo, Nadihal, Gurseer and adjoining areas will be affected from 10:00 AM to 01:00 PM on 06 August, 2025.

Moreover to carry out reconductoring works under RDSS, being executed by Project Wing, KPDCL, shutdown of 33 KV Amargarh-Watergam line shall be observed due to which 33/11KV Receiving Stations at Hadipora, Watergag, Hachipora, Ganapora, Safalpora shall remain off while power supply to Hadipora, Watergam, Hachipora, Ganapora, Safalpora, Watergam and adjoining areas will be affected from 08:00 AM to 01:00 PM on 07 August, 2025.

In a separate shutdown schedule issued here by the office of Chief Engineer KPDCL, in order to carry out the LT AB Cabling and stringing (segregation) works in 11 KV Lethpora feeder under RDSS works in Distt. Pulwama by PESL, shutdown of 33 KV Pampore-Lethpora line shall be observed due to which 33/11KV Receiving Stations at Konibal, Lethpora, LIS Lethpora and Mills shall remain off while power supply to Samboora, Lethpora, Patalbagh, Chandhara, Konibal, Dussoo and adjoining areas will be affected from 08:00 AM to 01:00 PM on 06 & 11 August, 2025.

KH Business Desk

KH Business Desk

Related Posts

Minister Javid Dar introduces Bill to amend J&K Cooperative Societies Act

Minister Javid Dar introduces Bill to amend J&K Cooperative Societies Act
by KH Business Desk
September 22, 2026

Srinagar, | Sept:21:Minister for Coperatives, Javid Ahmad Dar Monday introduced in the Legislative Assembly a Bill seeking to amend the...

Read moreDetails

Javid Dar inaugurates buyer-seller meet at SKICC

Javid Dar inaugurates buyer-seller meet at SKICC
by KH Business Desk
September 22, 2026

Srinagar, | Sept:21:Minister for Agriculture Production, Rural Development and Panchayati Raj, Cooperative and Election Department, Javid Ahmad Dar, Monday inaugurated...

Read moreDetails

Javid Dar inaugurates zonal workshop on National Supportive Supervision Framework

Javid Dar inaugurates zonal workshop on National Supportive Supervision Framework
by KH Business Desk
September 22, 2026

Srinagar, | Sept:21:Minister for Agriculture Production, Rural Development and Panchayati Raj, Cooperative and Election Department, Javid Ahmad Dar, Monday inaugurated...

Read moreDetails

UTLIMC reviews progress on PACS computerisation, directs timely completion of remaining deliverables

UTLIMC reviews progress on PACS computerisation, directs timely completion of remaining deliverables
by KH Business Desk
September 22, 2026

Srinagar, | Sept:21:Commissioner Secretary Cooperative, Yasha Mudgal, Monday chaired the 12th meeting of the Union Territory Level Implementation and Monitoring...

Read moreDetails

Javid Dar visits Handwara Fruit Mandi, assures priority resolution of growers’ concerns

Javid Dar visits Handwara Fruit Mandi, assures priority resolution of growers’ concerns
by KH Business Desk
September 20, 2026

Handwara, :Minister for Agriculture Production, Rural Development and Panchayati Raj, Cooperative and Election Department, Javid Ahmad Dar, Saturday visited Handwara...

Read moreDetails

DC Kulgam dedicates newly constructed Sumo Stand near Chambgund bridge to public

DC Kulgam dedicates newly constructed Sumo Stand near Chambgund bridge to public
by KH Business Desk
September 20, 2026

Kulgam, :The newly constructed Sumo Stand near Chambgund bridge at Kulgam has been dedicated to the public by the Deputy...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW