• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Thursday, November 5, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

Work on J&K highways in progress at an accelerated pace: MHA

Says ‘99.94% population being provided piped water, National Saffron Mission increased yield from 1.88 to 4.5 kg per Ha’

Agencies by Agencies
October 10, 2023
in Top News
A A
140 Police Officers Selected For Union Home Minister’s Medal For Excellence In Investigation
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar: Work on several national highways besides Zojila and Z-Morh tunnels is in progress with accelerated pace, besides that construction of Qazigund-Banihal tunnel on National Highway has reduced the travel time, MHA report has stated.
The MHA’s Annual Report for the year 2022-23 informs that under Prime Minister Gram Sadak Yojna (PMGSY), J&K achieved 3rd rank at the national level in terms of road length constructed, and the same rank was retained by the UT during 2020-21 also.
“Connectivity is a priority sector and critical for all round development of the UT of J&K. Qazigund-Banihal tunnel on Jammu- Srinagar Road has been completed, which has reduced the travel time with traffic plying from both sides every day,” it reads.
“Work on upgradation of Jammu- Akhnoor-Poonch road (National Highway (NH)-144A), Chenani-Sudhmahadev-Doda- Kishtwar-Anantnag Road (NH-244), Semi Ring Road Jammu, Semi Ring Road Srinagar, Baramulla-Gulmarg Road (NH-701), Srinagar- Shopian-Qazigund Road (NH-444), Zojilla and Z-Morh tunnels is in progress with accelerated pace,” it states further.
The report states that the implementation of National Mission on Saffron has ensured substantial increase in the crop yields from 1.88 kg/Ha to 4.5 kg/Ha, which has ultimately doubled the income of saffron growers.
“The UT Government has successfully got the G.I. tagging for saffron and basmati for effective domestic and international marketing, which will promote the economic prosperity of the farmers by enhancing the demand in national and international markets,” it reads, adding that “Under Jal Jeevan Mission, 99.94 population are provided with piped water. 57.84% individual households have tap connections. 23160 Schools, 24163 Anganwadi Centres, 3324 Health Institutions and 1666 Gram Panchayat buildings have been provided drinking water connections.”
The report states that the project Shahpur Kandi Dam is under execution at an estimated cost of Rs 2793.00 crore. “100% door to door collection has been achieved in all 1085 wards. 1400 crore action plan for integrated solid waste management for 78 Urban Local Bodies (ULBS) has been rolled out and is likely to achieve 100% Collection & Transportation and 60% waste processing in all these ULBS by 2023,” it said.
“Under Nasha Mukht Bharat Abhiyan, Government has covered 1764 villages, 1652 Educational Institutions and conducted 332 different activities for awareness, reaching out to 4950484 persons including 97050 youth. A composite Drug De-Addiction Centre (DDAC) has been set up in District Kulgam which was inaugurated by the Union Minister of State for Social Justice and Empowerment.”
The report further said that the Government of India has approved the establishment of DDACs in 7 more districts viz. Samba, Kathua, Poonch, Rajouri, Pulwama, Shopian, Srinagar and Bandipora.
“Under power sector, hydro power projects for 3100 MW capacity have been revived and put on track. Work on 1000 MW Pakal Dul and 624 MW Kiru is in full swing, Works of 800 MW Ratle was awarded. Pre- construction activities for 1856 MW Sawlakote project have been initiated by National Hydro Power Corporation,” it reads

 

Agencies

Agencies

Related Posts

Modern warfare now extends to space, cyber, digital domains: DM Rajnath

India Ready To Cross LoC To Maintain Its Honour: Rajnath Singh
by K H News Service
November 4, 2026

Says “Military preparedness in the 21st century cannot be separated from technological, industrial preparedness” Defence Minister Rajnath Singh on Tuesday...

Read moreDetails

CM Omar inspects construction of new Legislative Assembly Complex in Jammu

Never promised power rates won’t increase: CM Omar Abdullah on 6.83% electricity hike
by K H News Service
November 4, 2026

• Emphasises timely completion of work, • Adherence to quality standards and effective coordination among executing agencies Jammu | Nov...

Read moreDetails

FOIJ Chairman calls on LG Sinha, raises issues concerning industrial sector

LG reviews preparations for observance of Rashtriya Ekta Diwas
by K H News Service
November 4, 2026

Jammu | Nov 03:Tarun Singla, Chairman, Federation of Industries Jammu (FOIJ) and President, Bari Brahmana Industries Association (BBIA), on Tuesday...

Read moreDetails

Beyond banking: J&K Bank’s Lal Chowk branch drives enterprises, livelihoods

J&K Bank Q3 net profit jumps up 164% YoY to Rs 173.95 Cr
by K H News Service
November 4, 2026

From small businesses, young entrepreneurs to passenger vehicle operators navigating a rapidly shifting market landscape Custom Credit Solutions Powering the...

Read moreDetails

CM Omar distributes appointment letters to 17 candidates in PWD

CM Omar Abdullah greets people on Urs of Sheikh-ul-Alam (RA)
by K H News Service
November 4, 2026

Jammu | Nov, 03:Chief Minister Omar Abdullah on Tuesday distributed appointment letters to 17 candidates appointed in the Public Works...

Read moreDetails

Jammu &Kashmir Tourism showcases its offerings at WTM London 2026

Jammu &Kashmir Tourism showcases its offerings at WTM London 2026
by K H News Service
November 4, 2026

London| Nov 03:Jammu and Kashmir Tourism is participating in the World Travel Market (WTM) London 2026, being held at ExCeL...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW