• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Tuesday, June 23, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

J&K on a mission to become largest clean energy-producing UT

200 MW grid-tied rooftop solar power plants to be installed on residential buildings by JAKEDA under 'Solar City Mission'

K H News Service by K H News Service
July 28, 2022
in Top News
A A
AC approves installation of roof-top solar power plants, solar water pumps
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar, Jammu: J&K is on a mission to become one of the largest clean energy-producing UT in the country with an objective to reduce dependency on conventional sources of energy and enable J&K in attaining self-sufficiency in its energy needs.
J&K Government recognizes that renewable energy can also significantly increase J&K’s and the Nation’s energy security.
To achieve this milestone, the work is going on to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu to ensure that the electricity needs of the city are fully met from solar energy.
Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.
The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.
The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy is provided to the beneficiaries through the DBT mode.
An official said that these rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.
With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units, he added.
The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) targets of 10.5% as fixed by the Government of India.
The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.
The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.
J&K has a good potential for solar energy and the renewable energy capacity would help to bridge a part of its power requirement. Under the new budget in PM KUSUM Scheme, 375 Solar Water Pumps will be installed in 2022-23 providing electricity benefit to 47159 souls, direct agriculture benefit to 18750 souls, and indirect agriculture benefit to 160000 souls.
Notably, Prime Minister Narendra Modi inaugurated a 500-kilowatt solar power plant at Village Pali of Samba which will make it India’s first “carbon-neutral Panchayat.

K H News Service

K H News Service

Related Posts

LG Sinha Pays Obeisance at Mata Kheer Bhawani Temple on Jyeshtha Ashtami

At Kheer Bhawani Mela, Pandits seek support of locals for return home
by K H News Service
June 23, 2026

Offers prayers for peace, prosperity and well-being of J&K people Assures foolproof arrangements for devotees during annual Mela Interacts with...

Read moreDetails

At Republic Summit, Modi Outlines India’s Path to Global Power

PM Modi’s 12-Year Mega Milestone: Empowering A Billion Dreams
by United News of India
June 23, 2026

“Nearly 25 Cr Lifted Out of Poverty, Creating a New Neo-Middle Class” “Jan Aushadhi Kendras, Senior Citizen Schemes Drastically Reducing...

Read moreDetails

AI, modern technologies reshaping classrooms: LG Sinha

AI, modern technologies reshaping classrooms: LG Sinha
by K H News Service
June 23, 2026

• Felicitates Meritorious Students at Amar Ujala Medhavi Chhatra Samman Samaroh • Students urged to pair brilliance with compassion, innovation...

Read moreDetails

At Kheer Bhawani Mela, Pandits seek support of locals for return home

At Kheer Bhawani Mela, Pandits seek support of locals for return home
by Irfan Yattoo
June 23, 2026

• Tears, Prayers define emotional gathering at Tulmulla shrine • Community Says “Trust, coexistence key to rehab” Tulmulla: Tears rolled...

Read moreDetails

Indian Wushu Team Calls on CM Omar ahead of SCO Wushu Championship

Indian Wushu Team Calls on CM Omar ahead of SCO Wushu Championship
by K H News Service
June 23, 2026

Srinagar :The Indian Wushu Team, led by National Chief Coach of India and Dronacharya Awardee, Kuldeep Handoo called on Chief...

Read moreDetails

Farooq, Sat Sharma, Koul, Mehbooba visit Mata Kheer Bhawani Shrine

Farooq, Sat Sharma, Koul, Mehbooba visit Mata Kheer Bhawani Shrine
by K H News Service
June 23, 2026

Leaders offer prayers, interact with devotees, Says “Mela a symbol of Kashmir’s heritage” G’bal : National Conference President, Dr Farooq...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW