• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Friday, October 23, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home Top News

Govt. giving significant push to hydroelectric power generation across J&K

Projects of more than 6300 MW capacity in pipeline to make J&K power surplus

K H News Service by K H News Service
July 26, 2022
in Top News
A A
Union Power Minister visits Gurez
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar: The J&K government is giving a significant push to generation of hydroelectric power with projects of more than 6300 MW capacity in pipeline for making J&K power surplus.
To improve the current power capacity substantially, J&K has initiated a large-scale capacity augmentation programme. In 70 years, J&K was able to harness only 3500 MW, and now generation capacity is set to be doubled in four years and tripled in seven years.
Since August 2019, 2451 MVA has been added to the total capacity as compared to the 8394 MVA capacity achieved in seven decades. J&K Government launched various initiatives to strengthen and improve power infrastructure in J&K which had remained dilapidated for the last several decades.
The decade-long overdue up-gradation of power infrastructure which was ignored by successive regimes is being done in a sustained manner. According to a senior official, the present administration is eliminating the legacy of delays and all the languishing projects hanging for long are being completed in a record time.
Prime Minister, Narendra Modi during his recent visit to J&K laid the foundation stone of Ratle and Kwar Hydroelectric projects. The 850 MW Ratle Hydroelectric Project will be constructed on Chenab river in Kishtwar District at a cost of around Rs 5300 crore. The 540 MW Kwar Hydroelectric Project will also be built on the Chenab river in Kishtwar District at a cost of over Rs 4500 crore. Both the projects will help meet the power requirements of the region.
According to official figures 3100 MW of power projects worth Rs 22315 cr were revised, accelerated and Memorandum of understanding of 3284 MW of projects worth Rs 29600 cr were signed.
Pakal Dul Hydroelectric Project in Jammu & Kashmir cleared by cabinet for Rs 8,112.12 crore investment will help in reducing power shortage in the northern region.
“Investment of Rs 8,112.12 crore for construction of the (4×250 MW) Pakal Dul Hydroelectric Project has been approved,” an official said.
The project would help in reducing the power shortage in the Northern region and partly to utilize storage provisions of the Indus Water Treaty. It would also help in the socio-economic upliftment of remote areas of J&K.
Under a new scheme “Revamped Distribution Sector Scheme (RDSS), projects worth Rs. 11767 crore are approved to reduce AT&C losses and ensure 24×7 power availability.
In a historic move to realise the goal of making Jammu and Kashmir self-sufficient in power sector, Ratle Hydroelectric Power Corporation Limited (RHPCL) and Megha Engineering and Infrastructure Limited (MEIL) inked a contract agreement for the turnkey execution of 850-MW Ratle hydel project within a stipulated timeframe.
J&K has undertaken large-scale capacity augmentation programme in the power sector resulting in a huge leap in power transmission and distribution capacity. The new power generation projects like Ratle, Pakal Dul, Kiru etc, will bridge a major gap in J&K’s electricity requirements.
Similarly, 540 MW Kwar project being built at a cost of Rs 4526 cr would be completed by November 2026.
Notably, in a significant step towards boosting renewable energy projects in J&K, in the Union Budget 2022, an allocation of Rs. 476.44 crore has been made as grants towards equity for 800 MW Ratle Hydroelectric Project and Rs. 130 crore as grants towards equity for 624 MW Kiru Hydroelectric Project. It will boost energy transition and fight against climate change.
The distribution capacity is now 16754 MVA, while as in 2019 it was only 12745 MVA. The length of HT line is 45101 which was 41204 Ckms before 2019, while as length of LT line has increased from 79754 to 96017 Ckms from 2019 till date.

 

K H News Service

K H News Service

Related Posts

CM inaugurates three-day Kashmir Marathon Exposition at Polo View

CM Omar Abdullah congratulates Auqib Nabi on India Test call-up, says selection is a proud moment for J&K
by K H News Service
October 23, 2026

Omar appeals people to participate enthusiastically in Sunday’s marathon Srinagar| Oct, 10:Chief Minister Omar Abdullah Thursday inaugurated the three-day exposition...

Read moreDetails

Humanity Must Drive the Next Global Order: PM Modi AT NDTV World Summit

Parliament set to script history on Women’s Reservation, says PM Modi at Nari Shakti Vandan Sammelan
by Agencies
October 23, 2026

Says “ India Supports Inclusive Global Order Free from the Law of the Jungle” 'Viksit Bharat' as a Guarantee for...

Read moreDetails

PM Modi hails HM Amit Shah’s role in strengthening internal security on his birthday

Approval ratings indicate “global recognition of Modi Ji’s undeterred achievements”: HM Amit Shah
by United News of India
October 23, 2026

New Delhi : Prime Minister Narendra Modi on Thursday extended birthday greetings to union Home Minister Amit Shah, crediting his...

Read moreDetails

Modi, Netanyahu discuss West Asia crisis, reaffirm India-Israel strategic partnership

PM Modi Calls Up Netanyahu, Says “India Stands For Peace”
by Agencies
October 23, 2026

"Dialogue & Diplomacy": PM Modi’s Clear Message to Netanyahu on West Asia Conflict Leaders Reaffirm Commitment to India- Israel"Special Strategic...

Read moreDetails

CM Omar reviews developmental progress, implementation of govt schemes in Ang

CM Omar reviews developmental progress, implementation of govt schemes in Ang
by K H News Service
October 23, 2026

• Inaugurates, lays foundation stones for projects worth ₹52 Cr Anantnag| Oct, 10:Continuing his district-level outreach, Chief Minister Omar Abdullah...

Read moreDetails

Secy MoSJ&E lauds J&K’s grassroots welfare outreach, whole-of-government approach against drugs

Secy MoSJ&E lauds J&K’s grassroots welfare outreach, whole-of-government approach against drugs
by K H News Service
October 23, 2026

CS Dulloo reiterates commitment to saturation of welfare schemes Srinagar| Oct, 22: Union Secretary, Ministry of Social Justice and Empowerment,...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW