• About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service
Wednesday, June 24, 2026
The Kashmir Horizon
EPAPER
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper
No Result
View All Result
The Kashmir Horizon
No Result
View All Result
Home City News Srinagar

JK’s ERA starts work on Rs 9.67 crore “Rigid Concrete Pavement” of Civil sectt –Rambagh road

K H News Service by K H News Service
August 20, 2020
in Srinagar
A A
J&K Real Estate (Regulation and Dev) rules- 2020 approved,Web-based registration of Projects, Promoter and Agents  mandatory; details to be made public
Share on FacebookShare on TwitterWhatsappTelegramEmail

Srinagar: Jammu and Kashmir Economic Reconstruction Agency Wednesday started work on Rs 9.16 crore “Rigid Concrete Pavement “of Civil –Secretariat to Rambagh Chowk road. The work on the sub-project being executed under World Bank funded JTFRP (Jhelum Tawi Flood Recovery Project) was kick started in presence of Dr. Syed Abid Rasheed Shah, Chief Executive Officer, J&KERA/JTFRP.
Javed Iqbal Tara, Director, Kashmir JKERA informed CEO,JKERA/JTFRP that the 1.9 kms long road stretch is being upgraded with an objective of making the flood vulnerable portions of the Indira Gandhi road resilient to floods by using the rigid concrete pavement technology instead of the conventional flexible pavement which is more susceptible to damages during water logging. He said the road portion is being upgraded at an approximate cost of Rs 9.16 crore and will be strengthened with the laying three layers comprising of GSB (Granular sub Base), DLC (Dry Lean Concrete) and the final layer of PQC (Pavement Quality Concrete) The project has a timeline of 12 months and will directly benefit thousands of people living on both the sides of the road which include Rambagh, Solina, Allochibagh, Tulsi Bagh, Hazuri Bagh, Magarmal Bagh, Saraibala, Shaheedgunj, Maharaji Bazar, Natipora,Bakshi Stadium,Batmaloo etc.
Dr. Syed Abid Shah also inspected the progress of work on the “Rigid Concrete Pavement” of 1.49 km Peerbagh-Humhama road portion of the Indira Gandhi road in Srinagar. Director, Kashmir, JKERA informed that work on road stretch is in full swing and as on date work on 500 meters of road stretch has been completed.
This is for the first time that ‘Concrete Rigid Pavement Technology’ is being used at a large scale for up-gradation of roads in Jammu and Kashmir. The rigid concrete pavement technology is being used as a long term protection against the recurrent damages caused due to the frequent water logging during the torrential rains and to make the vital road stretch leading upto to the Srinagar International Airport more durable and flood resilient.
Similarly another very significant road in Srinagar city which is also vulnerable to recurrent damages due to water logging – eastern foreshore road around the Brari-Nambal water body in downtown Srinagar is also being upgraded using the “Rigid Concrete Pavement” technology under JTFRP. Confirmatory survey on the sub-project is underway and work on sub-project is being started soon.
Dr. Syed Abid Rasheed Shah, Chief Executive Officer, J&KERA/JTFRP directed the engineers to complete all the necessary formalities that are prerequisite for the start of work on other road sub-projects.. He also directed engineers to closely supervise and monitor the progress of works under execution to ensure that timelines for the completion of these works are met and all the quality control parameters of the works are fully complied with.
J&K ERA is executing the road upgradation sub-project as PIU (Project Implementation Unit) for the World Bank funded JTFRP (Jhelum Tawi Flood Recovery Project) under the component of Construction of Roads and Bridges.
Worth mentioning J&KERA under the JTFRP is PIU (Project Implementation Unit) for several other major road upgradation projects’ in Kashmir which include upgradation of Kadlabal-Lasjan, Pampore –Pulwama road, Hamray –Sultanpora Nowgam to Sumbal bridge , Shadipora –Khanpeeth Sumbal road, Hajin Ajas road via Saidanara, Rambagh- Civil secretariat road, Eastern foreshore road, Peerbagh to Humhama road, Parimpora-Soibugh road, Sangam-Khudwani road, Bijbehara to Karihama National Highway via Katriteng in Kashmir Division with a cumulative cost of Rs 270 crore approximately.

K H News Service

K H News Service

Related Posts

NIT Srinagar celebrates 12th International Day of Yoga with enthusiasm

NIT Srinagar celebrates 12th International Day of Yoga with enthusiasm
by KH Web Desk
June 21, 2026

Embracing yoga as a daily habit can help us achieve balance and lead healthier lives: Director   Srinagar, June 21:...

Read moreDetails

BJP picks its J&K incharge Tarun Chugh for Rajya Sabha

Muftis, Abdullahs acted like ‘private companies’, deprived JK people of dev: BJP
by KH Web Desk
June 4, 2026

Srinagar, June 4 : The Bharatiya Janata Party (BJP) has announced its National General Secretary and J&K & Ladakh in-charge,...

Read moreDetails

NIT Srinagar’s SANGAM-3.0 concludes at Gulmarg

NIT Srinagar’s SANGAM-3.0 concludes at Gulmarg
by KH Web Desk
June 1, 2026

May 31: The third edition of the global alumni reunion, SANGAM-3.0, concluded at Gulmarg on Sunday with a special networking...

Read moreDetails

Stop Peddling Lies on Urdu: CM Omar Abdullah Blasts PDP, Targets Iltija Mufti

Stop Peddling Lies on Urdu: CM Omar Abdullah Blasts PDP, Targets Iltija Mufti
by Agencies
May 1, 2026

Chief Minister Omar Abdullah on Friday dismissed claims about the removal of Urdu, asserting that no such decision has been...

Read moreDetails

 GCW organizes Painting Competition to champion NashaMukt Bharat Abhiyan

 GCW organizes Painting Competition to champion NashaMukt Bharat Abhiyan
by K H News Service
May 1, 2026

Srinagar : Government College for Women (GCW) Thursday successfully organized a vibrant painting competition under the banner of NashaMukt Bharat...

Read moreDetails

CIK searches Srinagar’s Central jail in terror case probe, seizes digital devices

CIK searches Srinagar’s Central jail in terror case probe, seizes digital devices
by United News of India
April 25, 2026

Srinagar, Apr 25 (UNI) Jammu and Kashmir Police’s Counter Intelligence Kashmir (CIK) unit on Saturday conducted searches inside Srinagar Central...

Read moreDetails

About

The publication of “Kashmir Horizon” as an English daily was started with a modest attempt on May 19, 2008.It has been a Himalayan attempt for “The Kashmir Horizon” to survive the challenges posed to journalism in the violence fraught place like Jammu & Kashmir.

MORE

Search in Archive

DIGITAL EDITION

  • About Us
  • Contact Us
  • Our Team
  • Advertise with Us
  • Contributors
  • FAQ
  • Privacy Policy
  • Terms of Service

© The Kashmir Horizon - Designed by Gabfire

No Result
View All Result
  • HOME
  • Region
  • City News
    • Srinagar
    • Jammu
  • News In Focus
  • Opinion
    • Editorial
    • Ideas
    • My Idea
    • Friday Faith
    • Letter to the Editor
  • Business
  • Sports
  • India
  • World
  • Snapshots
  • ePaper

© The Kashmir Horizon - Designed by Gabfire

✕
The Kashmir Horizon

FREE
VIEW